| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 50 Km. (as per direction of Supervising Engineer) :– |
| 2 | A) PCC Pole 11 mtr long. |
| 3 | B) 33 KV CT/ PT unit combind 10/5 Amp. |
| 4 | C) 33 KV Pilfer proof Metering Cubical |
| 5 | D) ACSR Dog Conductor |
| 6 | E) 33 KV XLPE Cable of size 3x120 sq.mm. |
| 7 | F) 33 KV Cross Arm |
| 8 | H) Top Channel (125x65x3200 mm.) |
| 9 | I) Dropper Channel (125x65x2400 mm.) |
| 10 | J) MS Angle (65x65x6 mm.) for brassing |
| 11 | K) 33 KV Disc Insulator |
| 12 | L) 33 KV Pin Insulator |
| 13 | M) MS Earthing Rod |
| 14 | N) 33 KV Stay Set Complete |
| 15 | O) 33 KV Cable Jointing Kit Outdoor/Indoor (3x120 sq.mm.) |
| 16 | Earting of each 33 KV line pole properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire. |
| 17 | Erection ofPCC pole 11 mtr. long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 18 | Fabrication and fixing of all 33 KV H.T/L.T. line accessories. |
| 19 | Erection of Double pole on PCC pole 11 mtr. after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 33 KV accessories and 33 KV pin insulators and making connection properly. (Riser & open line DP) |
| 20 | Fabrication and fixing of Double pole with all 33 KV H.T/L.T. line accessories. |
| 21 | Erection of four pole on PCC pole 11 mtr. after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 33 KV accessories and 33 KV pin insulators and making connection properly. (Riser & open line DP) |
| 22 | Fabrication and fixing of Double pole with all 33 KV H.T/L.T. line accessories. |
| 23 | Mounting of33 KV CT/ PT unitcombind 10/5 Amp. |
| 24 | Installation of 33 KV Metering cubical |
| 25 | Laying of ACSR Dog Conductor (sagging & jumpering properly) |
| 26 | Digging of open trench suitable for laying of 33 kv XLPE double cable of size 3x120 sq.mm. and refilling & restoration of road properly after laying of cable as per Respo. |
| 27 | Laying of 33 KV XLPE cable of size 3x120 sq.mm. in open trench using brick, sand & other material used for laying of cable as per Respo. All used material will be provided by contractor and cable provided by department. |
| 28 | Laying/ Hanging of 33 KV XLPE cable of size 3x120 sq.mm. in Air at double/four pole strecture after fixing of jointing kit. |
| 29 | Fixing of 33 KV Cross Arm |
| 30 | Fixing of Top Channel (125x65x3200 mm.) |
| 31 | Fixing of Dropper Channel (125x65x2400 mm.) |
| 32 | Fixing of MS Angle (65x65x6 mm.) for brassing |
| 33 | Fixing of 33 KV Disc Insulator |
| 34 | Fixing of 33 KV Pin Insulator |
| 35 | Fixing of 33 KV Stay Set with Grouting Complete |
| 36 | Fixing of 33 KV Cable Jointing Kit Outdoor/Indoor (3x120 sq.mm.) |
| 37 | Grouting of PCC pole 11 mtr. Long. |
| 38 | Providing and fixing stay clamps . |
| 39 | Providing and fixing PG Clamps suitable for jointing dog conductor. |
| 40 | Providing and fixing F Clamp |
| 41 | Providing and fixing Holding Clamp |
| 42 | Providing and fixing Danger Board with clamp |
| 43 | Providing and fixing Number plate with clamp |
| 44 | Providing and fixing Barbed Wire |
| 45 | Providing and fixing Stone Pad |
| 46 | Providing and fixing GI Pipe 6 Dia |
| 47 | Providing and fixing Bolt and Nuts . |