|
| 1 | AR to Beduwa Road Ch 1/950Earthwork in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layer, ramming, watering and disposal of surplus soil within a Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. BY MECHANICAL MEANS Depth upto 3m |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104P.C.C grade M 10 Nominal mix 1:3:6 |
| 3 | Stone masonry in cement mortar for substructure complete as per drawing & MoRTH specification Clauses 1402, 1405 & 2200Random rubble masonry In 1:4 cement mortar |
| 4 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.. 1000mm dia |
| 5 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per MoRTH specification Clauses 1312.4 & 2200 |
| 6 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level.P.C.C. grade M15 |
| 7 | Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503 Boulder/Quarry stone weighing not less than 40 kg (specfic gravity not less than 2.65) |
| 8 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304 |
| 9 | Structural Cement concrete for plain concrete/ reinforced concrete forsubstructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.Cincluding formwork P.C.C. grade M25 upto 5 metre height |
| 10 | Construction ofun-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cementas per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fullyautomatic Batching Plant andtransported to site intransit mixer for having continuous agitated mixer, manufactured as per approved mix designincluding pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawingand MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). |
| 11 | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery.\"The structural steel to be used should be Primary Steel manufactured and approved by Engineering in charged\"FE 415/500 Steel reinforcement |
| 12 | Providing A.C. pipe Weep holes 150mm dia in Masonry/plain Concrete/Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specification. [MoRTH Specification : Clause 2205]. |
| 13 | AR to Beduwa Ch 1/600Earthwork in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layer, ramming, watering and disposal of surplus soil within a Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. BY MECHANICAL MEANS Depth upto 3m |
| 14 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104P.C.C grade M 10 Nominal mix 1:3:6 |
| 15 | Stone masonry in cement mortar for substructure complete as per drawing & MoRTH specification Clauses 1402, 1405 & 2200Random rubble masonry In 1:4 cement mortar |
| 16 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.. 1000mm dia |
| 17 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per MoRTH specification Clauses 1312.4 & 2200 |
| 18 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level.P.C.C. grade M15 |
| 19 | Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503 Boulder/Quarry stone weighing not less than 40 kg (specfic gravity not less than 2.65) |
| 20 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304 |
| 21 | Structural Cement concrete for plain concrete/ reinforced concrete forsubstructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.Cincluding formwork P.C.C. grade M25 upto 5 metre height |
| 22 | Construction ofun-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cementas per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fullyautomatic Batching Plant andtransported to site intransit mixer for having continuous agitated mixer, manufactured as per approved mix designincluding pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawingand MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). |
| 23 | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery.\"The structural steel to be used should be Primary Steel manufactured and approved by Engineering in charged\"FE 415/500 Steel reinforcement |
| 24 | Providing A.C. pipe Weep holes 150mm dia in Masonry/plain Concrete/Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specification. [MoRTH Specification : Clause 2205]. |
| 25 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. |
| 26 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 |
| 27 | Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. |
| 28 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates ofgrading as per Table 500-7 premixed with bituminous binder, transported to site with all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per MoRTH Specification Clause 504. |
| 29 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510.Case - IIBy Mechanical MeansBitumen (VG-30) |
| 30 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per MoRTH Specification Clause 511 Case(II) Type B (ii)VG-30 Grade |
| 31 | Chikhli Ambara to Bamaniya Fala RoadEarth work in excavation for foundation of structurecompletewith all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305.In ordinary soil Depth upto 3 metre Depth upto 3 metre |
| 32 | Earth work in excavation for foundation of structurecompletewith all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305.In hard soil Depth upto 3 metre |
| 33 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level. |
| 34 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification including all material, labour, machinery as per clause 710.1.4 of IRC:78 and clause 2200 of MoRT&H specification. |
| 35 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304 Gravelly material |
| 36 | Cement Concrete for plain/reinforced concrete in open foundation at any level, complete as per drawing and technical specifications as per MoRTH Specification : Section 1200, 1500 & 1700 including formwork etc. R.C.C. grade M25 |
| 37 | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery. The structural steel to be used should be Primary Steel manufactured and approved by Engineering in charged \"FE 415/500 Steel reinforcement |
| 38 | Structural Cement concrete for plain concrete/ reinforced concrete forsubstructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.Cincluding formwork R.C.C. grade M25 upto 5 metre height |
| 39 | Supplying, fitting and placing TMT bar reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc. \"The structural steel to be used should be Primary Steel manufactured and approved by Engineering in charged \"FE 415/500 Steel reinforcement |
| 40 | Providing A.C pipe Weep holes 150mm dia in Masonry/Plain Concrete/.Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specfication as per MoRTH Specification Clause 2205 |
| 41 | Reinforced cement concrete wearing coat M30 grade at any level including formwork and reinforcement complete as per drawing and technical specification as per MoRTH Specification 2202, 1500 &1700 |
| 42 | Cement Concrete for plain/reinforced concrete in open foundation at any level, complete as per drawing and technical specifications as per MoRTH Specification : Section 1200, 1500 & 1700 including formwork etc. R.C.C. grade M25 |
| 43 | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery. The structural steel to be used should be Primary Steel manufactured and approved by Engineering in charged \"FE 415/500 Steel reinforcement |
| 44 | Structural Cement concrete for plain concrete/ reinforced concrete forsubstructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.Cincluding formwork R.C.C. grade M25 upto 5 metre height |
| 45 | Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc.\"The structural steel to be used should be Primary Steel manufactured and approved by Engineering in charged FE 415/500D HYSD Steel reinforcement |
| 46 | Providing and laying flooring of Rubble stone/ C.C M15 block over bedding complete as per drawing and technical specification as per MoRTH Specification : Clause 2505,1700 Rubble stone laid in cement mortar 1:3 |
| 47 | Providing and laying specified Apron complete as per drawing and technical specification as per MoRTH Specification : Clause: 2503 Cement concrete blocks (in M-15 grade) weighing not less than 40 kg each complete with form work etc as per MoRTH Specification: Clause:2504 |
| 48 | Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and MoRTH specifications Clauses 1700 and 2704 |
| 49 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 |
| 50 | Dry Lean Cement Concrete Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. |
| 51 | Construction ofun-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cementas per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fullyautomatic Batching Plant andtransported to site intransit mixer for having continous agitated mixer, manufactured as per approved mix designincluding pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawingand MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). |
| 52 | Structural cement concrete (Design Mix) in open foundations, with form work, at any level. Cement concrete for plain/reinforced concrete in open foundations as per drawing and technical specification. [MoRTH Specification : Section 1700 & 1500]. With 20mm nominal size aggregate P.C.C.M-15 grade |