Tender For Special Repair Work On Kamalpur Link Road. - Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Sub-base/Base (WBM Grading 3) specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405(By Manual Means). (Excluding G.S.T.) 2 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508( By Manual Means) Including tack coat. (Excluding G.S.T.) 3 Providing and laying seal coat by manual means with VG-10 sealing the voids in a Bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510( By Manual Means). (Excluding G.S.T.) 4 Construction ofun-reinforced, without dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days. (Excluding G.S.T.) 5 Construction of Patri on both side of the road withCarted Earth Cartage of Earth 5.00 Km with all lift and lead, transporting to site ,spreding grading to required slope and compacting as per SOR SI No 253 & 261 (C). complete in all respects Excluding GST. (Excluding G.S.T.) 6 Renewing patries 1.5 meterewide including dressing surface filling upto 8cm (3) depth and making namunas, at every 15 metre apart on either side of the road true to patri template with side slopes of 1:2 etc. trenches for taking the earth to be so dug that they form a continuous side drain at road boundary. (Excluding G.S.T.) 7 M-150 Brick on edge pavement on parties with bricks, laid dry joints filled with local sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8) depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. (Excluding G.S.T.)