| 1 | Load testing of chain pulley blocks-Dismantling of chain pulley block, cleaning of all parts,inspection, Replacement of defective berings, otherspares, assembling, shifting of chain pulley blocks, testload, slings etc, to compressor house maintenance bay,conducting load testing in presence of authorizedEngineer, painting and marking of test load,date on eachchain pulley block & submission of report. |
| 2 | Up to 5 MT capacity |
| 3 | 6 - 7.5 MT capacity |
| 4 | Load testing of slings & \"D\" shackles: Shifting of slings, \"D\"shackles, test loads, tools tackles etc, to compressor housemaintenance of slings in presence of authorized engineer,lubrication of slings with cardium compound, supply &providing aluminum tagging by punching. Engraving testload and date in each sling & D- shackle, staging of testedslings & \"D\" shackles in specified place & submission of report |
| 5 | Up to 1\" dia size |
| 6 | Above 1\" to 3\" dia size |
| 7 | Load testing of 100T & 25 T EOT Cranes.: Apart frombelow mentioned scope of work, Job also involves replacement of damaged clamps, painting of monkeyladder & replacement of corroded nut bolt on operating station |
| 8 | Opening of all plumber block, removal of old grease,cleaning, replacement of defective bearing & refilling offresh grease. |
| 9 | Cleaning of wire rope and application of cardiumcompound in 100 T EOT crane. |
| 10 | Cleaning of wire rope and application of cardiumcompound in 25 T EOT crane |
| 11 | Checking and top up of lubrication oil in all gear boxes |
| 12 | Shifting of concrete test blocks, load carrying frame D\"shackles etc, to maintenance bay, load testing of 100T&25 T EOT cranes. After completion of load testing shiftingback to workshop and site clearance |
| 13 | Load testing of 10T EOT Crane at compressor House:Mobilization of tools, tackles, required manpower, shiftingload carrying frame, shifting of test loads to compressorhouse. Checking lub. oil level and top up in gear boxes,replacement of grease in all plumber blocks, cross travel inthe frame for each crane, providing required slings loadtesting in presence of authorized engineer , removal of alltest loads, shifting to storage area and site clearance. |
| 14 | Mono Rail : Dismantling of trolley, cleaning of all parts,inspection, replacement of defective bearings, otherspares assembling, shifting of chain pulley blocks, testload, slings etc. to requisite place, conducting load testingin presence of authorized Engineer, painting and markingof test load, date on the same & submission of the report |
| 15 | Scaffolding Shifting, erection & de-erection |