Tender For Repair Of Damaged Gss Boundary Wall Towards Colony Side At 132 Kv Gss Shahpura - Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar. (P-160/14.9.2)  2 Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead.(P-161/14.18)  3 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils. (P-69/1.8)  4 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).(P-76/3.1.6)  5 Random Rubble stone masonry for with hard stone infoundation and plinth in Cement Sand mortar above 30 CM thick wall in Cement Mortar 1:6 ( 1-Cement : 6-Sand). (P-88/6.1.6)  6 Brick work with F.P.S. bricks of class designation 75 insuperstructure above plinth level upto floor V level in allshapes and sizes in Cement mortar 1 : 6 (1 cement : 6 coarse sand) (P-85/5.2.2)  7 Add extra for Square or Rectangular Pillars in Superstructre brick work up to five storey Upto 45 cm length and two corners are free (P-85/5.3.2)  8 Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering. M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). (P-76/3.2.2)  9 Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix (P-59/4.1)  10 Centering and Shuttering with plywood or steel sheetsincluding strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc.(P-81/4.9)  11 Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , basesof columns etc. Columns, pillars, posts and struts etc.(P-81/4.10.3)  12 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (Original producers who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)(P-82/4.13.3)  13 Providing&fixingprecastcementconcretecoping1:2:4mix50mmthickcompleteas per specification. (P-78/3.8)  14 Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish 20 mm thick. (P-144/12.3.2)  15 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete:(P-112/9.2)  16 Refebrication work with existing steel work including cutting,welding & refebrication as per requirement with fixing at sitecomplete as per direction of Engineer In charge (P-153/13.28)  17 Colour washing of all shades to give an even shade including all scaffolding New work (two or more coats) with a base coat of whiting. (P-148/12.35.2)  18 Painting with synthetic enamel paint of approved brand and manufacture togive an even shade : Two or more coats on new work (P-150/12.46.1)  19 Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding. New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). (P-149/12.42)  20 S & F galvanized barbed wire including streching complete in all respect as directed by site incharge. (P-103/9.33)  21 Recover cost of useful stone @ 2/3rd of masonry work dismantaled quantity. (P-70/ Note)