|
| 1 | Topographical survey by using Total station Equipment with a view of preparing Site plan by closing travers specially Road Survey (contour not required) of Following Different areas in UIT kota. Including outlines of civil structures & main Physical features Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. (HT/132M etc.) Drain. Water Supply Pipe tine; H.P. Electric Poles, Telephone Pole, Boundary walls, True North as required and all complete. Taking Plinth levels at a!! important structure by Using Auto Level with reference to BM. Including all Modifications as per Direction of Engg. Incharge Submission of Four Sets of Print along with CD. Ail above detail including level on a 1:500 scale on A 4 or A-2 sheet. All the Drawings shall be prepared in digitized format through executable Auto-cad software on Compact Discs |
| 2 | (i) Open Area: |
| 3 | (a) Upto2hect |
| 4 | (b) 2 to 5 hect(For area in excess of 2.0 hect. |
| 5 | (c) Above 5 hect (For area in excess of 5.0 hect.) |
| 6 | Builtup Area: |
| 7 | (a) Upto2hect |
| 8 | (b) 2 to 5 hect(For area in excess of 2.0 hect. |
| 9 | (c) Above 5 hect (For area in excess of 5.0 hect.) |
| 10 | Semi Builtup Area: |
| 11 | (a) Upto2hect |
| 12 | (b) 2 to 5 hect(For area in excess of 2.0 hect. |
| 13 | (c) Above 5 hect (For area in excess of 5.0 hect.) |
| 14 | Katchi Basti area |
| 15 | (a) Upto2hect |
| 16 | (b) 2 to 5 hect(For area in excess of 2.0 hect. |
| 17 | (c) Above 5 hect (For area in excess of 5.0 hect.) |
| 18 | Chauraha/Tiraha |
| 19 | Topographical Survey .long with preparation of Contour Plan with Total Station equipment by taking levels at a spacing of 5Mx5M or less in two mutually orthogonal directions, keeping variation in levels within 0.25m of the sites and Plotting contour at 0.25m intervals. Including outlines of civil structures & Main Physical Structures Such as Park, Tree, Road, Canal, Culvert, Govt. Building, Power line. (HT/132kv etc), Drain, Water Supply Pipe Line, 11.P., Electric Poles, Telephone Pole, Boundary Walls, True North as required and all complete. Also Works Include Taking Plinth levels \" at all important structures by Using Auto Level with refernce to B.M. Submission of all survey work data\"s executed at Computer in Auto-cad and Auto Plotter Software. Along with CD. all details including level on a 1:500 scale on A-l or A-2 sheet. All the Drawing shall be prepared in digitized format through executable Auto-cad software on Compact Discs. |
| 20 | (a) Upto2hect |
| 21 | (b) 2 to 5 hect(For area in excess of 2.0 hect. |
| 22 | (c) Above 5 hect (For area in excess of 5.0 hect.) |
| 23 | Topography survey by using Total station Equipment of Proposed or Existing Roads to draw L-section taking levels at 30mt. spacing and draw cross-section at every 30mt. by taking levels at a spacing of 1.0 mt. on both side of road in a width of 100 mtr. Or as required. Giving offsets distances from center line of road at every 100mt along the route and at every point of change in direction, from some permanent objects with bearing. Including taking outlines of civil structure and main Physical structures Such as Park, Tree. Road. Canal. Govt. Building . Power line. (HT/I32kv etc.), drain. Water Supply Pipe Line, Elect Poles, Tele. Pole, Boundary walls. True north as required and all complete. As per the direction of the Engineer in charge Taking Plinth levels at all important structure by using Auto Level with reference to BM as per the directions of the Engineer -in- incharge including providing one draft copy and incorporation of the suggestions/ observation given on draft copy. L- Section of Road on a vertical scale of 1 cm=1 mt and horizontal is lcm=30mt on A2 size sheet with a space of minimum 3 rows below L-section and standard title blocks. Plan of Road survey in scale of Icm=5mt, On A2 size sheet. |
| 24 | (A) Road |
| 25 | (B) Nala |
| 26 | Topography survey by using Total station Equipment with a view to Superimpose Revenu KhasraMaps in UIT area of kota city.(a) It Including Survey oi all Revenue Civil Structures and Physical features such as Village, Gadar, Culvert, well, Pond wall, Bowari, Nallah, Road & Other state time Structures etc.(b) It include Marking of Different types of Revenue Lands in Diff. Colours according LRO such as Each 7500 Govt Land, Siwai chack, Private Land, Forest, etc. Submission of four sets of print on a 1:40 scole Villageon A-l sheet along with CD. All the drawings shall beprepared in digitized Drawing with Auto¬CAD Software |
| 27 | Levelling of Proposed road taking initial levels and final levels after earth work Including Earthwork Quantity Calculation by Auto Plotter Soft-ware and Draw L-section & X- section of proposedroad. All the drawings shall be prepared in digitized format through executable Auto-CADSoftware. Submission of four sets along with CD.(A) Road- |
| 28 | (B) Open Area/Park: |
| 29 | Upto 1 Hect |
| 30 | Above 1 hect (For area in excess of 1.0 hect.) |
| 31 | Providing and fixing of stone Demarcation pillar of size 100 x 100 x 900mm Including fixing in cement concrete 1 : 2 : 4 excavation transportation of pillar at required location with all lead and lift as per direction of engineering incharge. |
| 32 | Providing and fixing of precast cement concrete Demarcation pillar of size 150 x 150 x 900mm Including fixing in cement concrete 1 : 2 : 4 excavation transportation of pillar at required location with all lead and lift as per direction of engineering incharge |
| 33 | Demarcation (Lay-out) by using Total Station Equipment stack out Method with X,Y,Z Co¬ordinates of Developing Concepts Such as Proposed Road/Boundary wall/Proposed Colony Lay-out/Road Center Line and Both Side (according Department Engg.) / Grid Pillers/Plol Pillars etc. on the ground using wooden Pegs in UIT areas Rate to include erection of wooden Pegs, All materials such as Lime, String, labors etc. Helping Civil Supervise appointed in marking center Point. Co-, ordinates an levels on Grid Pillars with reference to pre-established Permanent B. M. indicating the Pillars is representing Survey |
| 34 | (A) OpenArea: |
| 35 | (a) Upto2hect |
| 36 | (b) 2 to 5 hect(For area in excess of 2.0 hect. |
| 37 | (c) Above 5 hect (For area in excess of 5.0 hect.) |
| 38 | Roads/Bounary wall |
| 39 | Upto 1km |
| 40 | above 1 km(For length in excess of 1.0 Km.) |
| 41 | Work including leveling of open area for different purpose etc. as required |
| 42 | (A) Having initial and final levels of billing work of parks with earth work calculation and level sheets complete. |
| 43 | (B) Contour leveling work with complete levels and providing level and contour sheet. |
| 44 | Work including leveling of drain/Nallah having initial levels and final levels after earthwork with earthwork Qty. calculation and L-Section and X-Section of proposed road having width as blow |
| 45 | (A) upto 15 m |
| 46 | (B) more than 15 m |
| 47 | Work including leveling of road having initial levels and final levels after earthwork with earthwork Qty. calculation and L-Section and X-Section of proposed road having width as blow |
| 48 | (A) 30 m |
| 49 | (B) 40 m |
| 50 | (C) 60 m |
| 51 | Double leveling for transfer of bench mark etc. |
| 52 | (A) Open area |
| 53 | (B) Semi hilly area/ Semi Built up |
| 54 | Hilly area / Bulit up |
| 55 | Tariff of PlottingPlotting Services on Plotter Device : A4 size to AO size |
| 56 | AO size(1190mmx841mm) Colour Print |
| 57 | AO size(l 190mmx841mm) Black & White |
| 58 | AO size(1190mmx841mm) Tracing Paper |
| 59 | Al size(841mmx595mm) Colour Print |
| 60 | Al size(84Immx595mm) Black & White |
| 61 | Al size(841mmx595m\"m) Tracing Paper |
| 62 | A2 size(595mmx421 mm) Colour Print |
| 63 | A2 size(595mmx421 mm) Black & White |
| 64 | A2 sizc(595mmx421mm) Tracing Paper |
| 65 | A3 size(421mmx297mm; Colour Print |
| 66 | A3 size(421mmx297mm) Black & White |
| 67 | A3 size(421mmx297mirs) Tracing Paper |