| 1 | Dismentlingbrick workor stone work including stacking of dismantled materials as directed by the Engineer-in -charge within a distance of 60 m (200 feet) |
| 2 | Earth work in Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M and lead upto 30M. And including filling. |
| 3 | Concrete with 4 cm. guage brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials, labour, Tools & plants etc. required for proper completion of the work |
| 4 | M-150 Brick work in one part cement and four coarse Sand foundation including supply of all material, labour, tools & plant etc. |
| 5 | M-150 Brick work in one part cement and four coarse Sand in superstructureincluding supply of all material, labour, tools & plant (305(a)+309=5170+410=5580) |
| 6 | Dismantling existing plaster including disposal of refuse as direct by the Engineer-in-charge with a distance of 60 m(200 Feet) |
| 7 | 12MM thick cement plaster with cement & coarse sand in 1:2 over brick work minimum thickness not to be less then 1cm including supply of all material labour, tools & plant ect. S.I. No. 584 (New Item) |
| 8 | Cement Concrete with 2 cm gauge approved stone ballast, corse sand & cement in the proportion of 4:2:1 including supply of all materiasls, labour, tools, & plants etc. required for proper completion of work. |
| 9 | Supply and fixing 6 MM China white glazed tiles in flooring or in skirting or dado laid with 1:3 Cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and tools and plants. |
| 10 | Supply and fixing of kota stone in flooring 20mm thick and joint filled with 1:2 cement and coarse sand with app. Colouring materials to be given an even shade with 20 mm base coat (bedding)of 1:4 cement &coarse sand morter and polished by hand of machine and finally finished with french manson police or other app. polish including supply of all materials, labour, Tools & plants etc. required for proper complrtion of work |
| 11 | providing wall putty on new surface with approved quality material of Berger/ J.K/ Birla or similar make 2 coats. New item |
| 12 | providing wall putty on old surface with approved quality material of Berger/ J.K/ Birla or similar make 2 coats. New item |
| 13 | Finishing wall with water proof cement paint of approved make and quality on new wood with two coat to give an even shade including supply of all materials, labour,Tools& plant etc. required for proper completion of the work (660+661=70+25=95) |
| 14 | Fixing of Main Gate/steel shutter/ Garrage Gate etc |
| 15 | Removing paint or varnishing with paint remover or with caustic Soda, including supply of all materials, labour,Tools&plant etc. required for proper completion og the work |
| 16 | Painting or varnishing work in small areas or new wood work with one coat (upto one square meter of ready mixed priming paint and one coat of app. Superior quailty ready mixed paint or varnish including supply of all materials, labour, Tools&plants etc.requiredfor proper completion of the work.(641+642=80+35=115) |
| 17 | G.S.T |