| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Dismantling brick work or stone work in lime or cement mortar and i/c stacking or materials as directed by the Engineer-in-charge with in a distance of 60 meter (20 Feet) |
| 3 | 1st class (M-150) brick work with 1:4 cement mortar using cement amd Coarse sand inclduing cost of allmaterials, labour, T&P etc. |
| 4 | Laying Ordinary centering and shuttering for R.C.C worksi/c. all cost ofmaterial, labour, T&P etc. complete the work. |
| 5 | Supplying & fixing of Reinforcementsteel for R.C.C work i/c cutting ,bending ,binding and cost of binding wire and steel i/clabour and T&P etc. complete the Work. |
| 6 | Supplying& Fixing mild steel or iron work in heavy size such as trusses, builts gates door, frames record racks roofs work, gates, Gril, Stair etc. including cost of all materials, labour and T&P etc. complete. |
| 7 | Laying R.C.C. 1:1.5:3using size (5.6-13.20) mm graded crushed aggregatei/c all cost materials, labour, T&P etc. copmlete of work. |
| 8 | Laying C.C. 1:2:4using size (5.6-13.20) mm graded crushed aggregatei/c all cost materials, labour, T&P etc. complete of work. |
| 9 | 20 mm thick Cement plaster on brick masonary with 1:4 cement mortar unsing cement and Coarse sandi/c. cost of all material, labour, T&P etc. complete. |
| 10 | Struck deep cement pointing in 1:2 C:M including cost of all material labour T&P etc. completion the work. |
| 11 | Providing cement primer on old/new surface i/c cost of all material, labour T & P etc. Complete |
| 12 | Finishing wall with Two coat of water proof cement paint weather coat of approved quality on previously new surface with this paint to give an even shade includingsupply of all materials, labour, Tools and plants etc. required for proper completion of the work. |
| 13 | Applying primer coat over new Steel or other metal surface after paint including preparing wood work surface including preparingthe surface by thoroughly cleaning oil grease dirt and other foreigh matter and scoured with wire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work. |
| 14 | Painting two coat over Priming coat (But excluding cost of priming coat) on wood or Steel or other metal surface with superior synthatic enamel paint of standard make brushing to give an even shade and finished and including cleaning the surface all dirt dust and other foreign matter sand papering and striping including cost matter and scoured withwire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work. |
| 15 | Making of New Wooden Falings Shutter Gate with 7.5 CM thick Shisham wood with all cost of material, labour, T&P and Iron work etc. complete of work. |
| 16 | Making of New Wooden Falings Shutter Gate with 7.5 CM thick Shisham wood with all cost of material, labour, T&P and Iron work etc. complete of work. |