Construction Of Land Development Work(Part-1) For Direct Outlets Of Pilandri Dy. Ch No. 0 To 7700 M Offtaking From Pendhari Branch Of Nerla Lis.=PART- A – EARTHWORK ITEM NO.1 :- Construction of field channel Earthwork including site clearance,excavation in soil, silt, murum, soft rock etc.preparing embankment from available and borrow material, dressing sides, watering and compaction including all leads & lifts etc complete. (Without GST & Royalty) ITEM NO.2 :- Construction of Field Drain including site clearance, excavation in soil/silt/murum/soft rock etc. including disposing the excavated material as directed, dressing sides with all leads and lifts etc. complete. (Without GST & Royalty) Item No. 3 :- Providing R.C.C.1:2:4 Lining with circular or other shape opening for water way including necessary form work, compaction finishing, and curing, excavation, boulder and murum filling, back filling as per drawing etc complete. (Excluding Royalty & excluding GST ) Item No. 4 :- Construction of Division box including excavation in soil, silt, murum, soft rock etc, filling foundation with rubble and hard murum Providing and laying cementconcrete 1:2:4, steel reinforcement as directed, and back filling with approved material including all leads and lifts etc complete (contractor own material) excluding Royalty & excluding GST as per specification Item No. 5 :- Construction of Turn Out including excavation in soil, silt, murum, soft rock etc, filling foundation with rubble and hard murum, Providing and laying cement concrete 1:2:4, steel reinforcement as directed, and back filling with approved material including all leads and lifts etc complete (contractor own material) excluding Royalty & excluding GST as per specification. Item No. 6 :- Construction of Fall of various height including excavation insoil, silt, murum, soft rock etc, filling foundation with rubble and hard murum, Providing and laying cement concrete 1:2:4, steel reinforcement directed, and back filling with approved material including all leads and lifts etc complete (contractor own material) excluding Royalty excluding GST as per specification A FALL/DROP 0.30 M FALL/DROP 0.45M C. FALL/DROP 0.60 M D. FALL/DROP 0.90 M Item No. 7 :- Construction of Cart track bridge, hume pipe culvert and well including excavation in soil, silt, murum, soft rock etc, filling foundation with rubble and hard murum, Providing and laying cement concrete 1:2:4, steel reinforcement, diversion and preparing embankment with approved materials as directed, and back filling with approved material, Providing and laying required Nos. of R.C.C. NP2 class pipes 300 mm dia including all leads and lifts etc complete (contractor own material) excluding Royalty & excluding GST as per specification. a. CTB/CTC b. HPC