| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. |
| 2 | Supply and laying of Ordinary Sand up to G. L. for easilay and early compactionincluding cost of all material labour T&P etc.as per directed by engineer in charge completefor proper completion of work. |
| 3 | Cement Concrete in (1:3:6) M10 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work |
| 4 | RCC 1:2:4 including all costs of T&P material required for proper completion of work as directed by Engineer-in -charge. |
| 5 | Centering & shuttering for P.C.C.work of Cut off, Boxetc. including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . |
| 6 | Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. |
| 7 | Centering & shuttering for RC.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. |
| 8 | Providing & Fixingsteel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 9 | P/f RCC Hume Pipe 1200 mm dia NP-3 type including cost of all material, labour, T&P etc for proper completion of work complete as directed by Engineer-in- charge. |
| 10 | Providing & Laying of with 20.00 to 40.00 kg boulder in including cost of all material, labour and T&Ps etc. complete required for proper complition of work |
| 11 | Provide & Fixing PVC water stop for expantion/ construction jointincluding all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. |
| 12 | Providing & Fixing pvc pipe 75 mm dia for weep hole above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the Abutment in position including cost of all mterial, labour and T&P for proper complition of work. |
| 13 | Providing and fixing of nomitax Board for expansion / construction joint i/c all cost of material labour T & P etc. for proper comp. of work. |
| 14 | Supplying & Fixing B.M. plate 150 X 150 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. |
| 15 | Supplying & Fixing Marble Name & year plate 450 X 300 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. |
| 16 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also includingall lift and Lead upto 600mdistance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. |