}

Tender For Repairing Of Link Road Hari Gao Bazar - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin Deptkand Earthwork In Embankmentto Be In 20 Cm (8) Layers, Including Ramming , naugarh-Uttar Pradesh

Tender Notice

52036763
Tender For Repairing Of Link Road Hari Gao Bazar - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin Deptkand Earthwork In Embankmentto Be In 20 Cm (8) Layers, Including Ramming
Tender
Indian
Uttar Pradesh
Naugarh
10-11-2025

Tender Details

Tender For Repairing Of Link Road Hari Gao Bazar - Earthwork in cutting or in embarkment in ordinary soil, excavationto be in theform ofregularpitsnot exceedingI/2 metre(20gin deptkand earthwork in embankmentto be in 20 cm (8) layers, including ramming & dressingthe surfaceto requiredlevelsand slopes and also including 1.5 metre (5ffs) liíts and 30m. (100) lead.The earthfrom cuttingto be used in making embankmentor to be depositedas directedby Engineer-in-charee. 2 Providing and laying 7.50 cm compacted thickness of stone aggregate of specific sizes 22.4-53 mmof water bound macadam specification incluiding spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stage to proper grade and camber applying and brooming stone dust to fill-up the interstices of coarse brooming stone dust to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading-3 as per technical Speicification clause 405 including cost of material, roller, cartage, loading, unloading, labour and all taxes complete or as per direction of Engineer in charge. 3 Providingand applyying prime coat with bitumen emulsionon prepaired surfaceof granular base including cleaning of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means as per Technical Speicification Clause 502( including cost of maxphalt) 4 Providingand applying tack coat with bitumen VG-10 at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer complete as per Technical speicification Clause 503 5 Providinglaying and rolling of open-grade premix carpet of 20mm thickness composed of (Aggregate (a) Nominal stone size 13.2 mm ( passing 22.4 mm sleve and retained on 11.2 mm sleve 0.18 cum. (b) nominal stone size 11.2 mm (passing 13.2 mm sieve and retained on 5.6 mm sieve-0.09 cum) using VG-10 bituminious binder @ 1.46 Kg/sqm H.P.C./I.O.C. make complying with IRC:Sp 53 to required line, grade and suitable plant, laying and rolling with a three wheel 80-100KN static roller capacity finished to required lavel and grades to be followed by seal caot of type C including cost of all materials, labour, T&P etc required for proper comletion as per Technical Specification Clause 508 of MORD Specification. 6 roviding and applying seal coat type C comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne KN Static roller and finishing to required level and grades as per technical Specification Clause 510 7 Brick edging on both side of the road of first class bricks 8 cm (3) wide and 12 cm. (4.5) deep laid with mud mortar including labour & supply of bricks finish to the required templeate and in proper aligment and also including dressing ramming the excavated earth as directed by Engg. in charge. SI No 765 8 Providing and fixing of typical informatory sing board as per MORD specification and drawing. Three MS plates of 1.6 mm thick top and middle plate duly welded with MS flat iron 25 mmX5mm size on back on edges. The lower plate will be welded with MS angel Iron frame of 25mmx5mm. The angel iron frame of the lower most plate and flat iron frame of middle plate will be weeded to 2 No. 75mmX75mm of 12SWG. sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mmX600mm, 600mm below ground level. All MS will be stove e named on both side. Lettering and printing arrows, enamel paints of superior Quality in required Sade and color. all sections Of framed posts and steel tube will be painted with primer and two coat of epoxy paint as per Drawing clause 1701 and Annexure 1700.1. 9 (Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% 10 (Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 2.00% 11 (Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 3.00% 12 (Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 4.50% 13 (Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 6.00% 14 Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3as per Technical Specification Clause 405 15 Providing and laying of interlocking concrete block pavement having thickness 80mm as per drawing and technical specification clause 1504. 16 Class 150 brick work in 1:4 cement and coarse sand mortar in foundation. 17 Providing and laying ofcement conrete 1:5:10 (1 cement: 5 fine sand : 10 graded stone aggregte 20 mm nominal size ) including curing, supply of all material, labour, T&P etc complete in all respect required for proper completion of the work. (DAR-4.1.3) 18 R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 283) 19 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m as directed by the E/I . All Kinds of soil..(DAR-2.1.1) 20 (Interlocking Work Item No. 13 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% 21 (Interlocking Work Item No. 14 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% 22 (Interlocking Work Item No. 13 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% 23 (Interlocking Work Item No. 13 T0 19)The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% 24 (Interlocking Work Item No. 13 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%

Key Value

Document Fees
INR 4700 /-
EMD
INR 265000.0 /-
Tender Value
INR 26.50 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail