Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #52024763

Tender For Rural Road Maintenance Scheme

Issued by Local Bodies · kadayampatti, Tamil Nadu
Tender Value
7.94 Lakhs
Estimated cost
Bid Submission
05 Nov 2025
0 days left
EMD
8000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kadayampatti → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Rural Road Maintenance Scheme; 1 Potholes Repair Road from Veesarddiyur To Marakkottai Road Km 0/0-2/650, H/O : Kongupatty 2 Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete. 3 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m 4 Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms 5 Km 0/0 -1/000 6 Km 1/000-2/000 7 Km 2/0-2/650 8 Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal 9 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete 10 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it 11 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc. 12 Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 13 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 14 2. Potholes Repair Road from Pukkampatty Bt Road to Kotthapuilynur kv Mathiyan House Km 0/0 -0/530m .H/o: Kongupatty 15 Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete. 16 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m 17 Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms 18 Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal 19 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete 20 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it 21 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc. 22 Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 23 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 24 3. Potholes Repair Road from Kongupatty 4roads to Pallakadu Km 0/0 -0/810m .H/o: Kongupatty 25 Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete. 26 Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms 27 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete 28 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it 29 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc. 30 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

BOQ

Name of Work:- Rural Road Maintenance Scheme
Sl. No. Item Description
1Potholes Repair Road from Veesarddiyur To Marakkottai Road Km 0/0-2/650, H/O : Kongupatty
2Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete.
3Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
4Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms
5Km 0/0 -1/000
6Km 1/000-2/000
7Km 2/0-2/650
8Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
9Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete
10Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it
11Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc.
12Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
13Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
142. Potholes Repair Road from Pukkampatty Bt Road to Kotthapuilynur kv Mathiyan House Km 0/0 -0/530m .H/o: Kongupatty
15Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete.
16Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
17Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms
18Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
19Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete
20Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it
21Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc.
22Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
23Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
243. Potholes Repair Road from Kongupatty 4roads to Pallakadu Km 0/0 -0/810m .H/o: Kongupatty
25Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete.
26Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms
27Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete
28Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it
29Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc.
30Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
31GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 52024763
AUTHORITY Local Bodies
TENDER VALUE 7.94 Lakhs
LAST DATE 05-11-2025
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender For Rural Road Maintenance Scheme; 1 Potholes Repair Road from Veesarddiyur To Marakkottai Road Km 0/0-2/650, H/O : Kongupatty 2 Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete. 3 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m 4 Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms 5 Km 0/0 -1/000 6 Km 1/000-2/000 7 Km 2/0-2/650 8 Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal 9 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete 10 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it 11 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc. 12 Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 13 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 14 2. Potholes Repair Road from Pukkampatty Bt Road to Kotthapuilynur kv Mathiyan House Km 0/0 -0/530m .H/o: Kongupatty 15 Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete. 16 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m 17 Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms 18 Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal 19 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete 20 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it 21 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc. 22 Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. 23 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 24 3. Potholes Repair Road from Kongupatty 4roads to Pallakadu Km 0/0 -0/810m .H/o: Kongupatty 25 Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products andclearing as directed by the departmental officers including all incidental charges etc., complete. 26 Providing and laying including cost and conveyance of gravel from approved sources to work site includinglabour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100%compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all otherincidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and sideberms 27 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)specification including premixing the material with water at OMC in machanical mix plant carriage ofmixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Basecourse on well prepared surface and compacting with vibratory roller to achieve the desired densityincluding cost of material,labour charges, rentals for machinery, fuel and all other incidental chargesetc., complete 28 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMMsurface preparatory to another bituminous construction over it 29 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc. 30 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Basic Detail
Tender No Roc.No.3338/2025/A3
Bidding Type Tender
Location
City kadayampatti
State Tamil Nadu
Key Dates
Publish Date 29 Oct 2025
Submission Date 05 Nov 2025
Open Date 05 Nov 2025
Finance
Tender Value 7.94 Lakhs
Tender Fee Ref. Documents
EMD 8000
Exemption Not Available
Document List
01.pdf
92c3f592-f8c6-422e-b53f-f4bfc95e8a9e.html
BOQ_738944.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 29, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 05, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 05, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

01.pdf

html

92c3f592-f8c6-422e-b53f-f4bfc95e8a9e.html

xls

BOQ_738944.xls

pdf

Tendernotice_1.pdf

Disclaimer