| 1 | Description of items |
| 2 | Transportation of DC Rig machine including cost of labour etc. complete. (UPGWD SOR) |
| 3 | Water supply charges for drilling work. (UPGWD SOR) |
| 4 | Boring/drilling bore well requried dia for casing/strainer pipe,by suitable method prescribed in IS:2800(part I),including collecting samples from different strata,preparing and submitting strata chart/bore log,including hire & running charges of all equipments,tools,plants& machinerires required for the job , all complete as per direction of Enginner-in-charge,beyond 90 metre & upto 150 metre depth below ground level.( DSR 23.2.1.1) |
| 5 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge. (DSR 23.3.2) |
| 6 | Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge. (DSR 23.4) |
| 7 | Providing & fixingM.S. clamp of required dia to the top of casing/housing pipe of tubewell as per IS:2800 (part I), including necessary bolts & nuts of required size complete. (DSR 23.14.2) |
| 8 | Providing & fixing of 150 mm dia MS pipe (confirming IS:1239) (UPGWD SOR) |
| 9 | Providing & fixing of MS clamp for holding of MS pipe. (UPGWD SOR) |
| 10 | Providing & fixing of 200 mm x 200 mm square MS plate including 4 nos. fasteners etc. (UPGWD SOR) |
| 11 | Providing & filling of Pea Gravel of size 2 mm to 4 mm dia into bore well including cost of labour, material etc. required for proper completion of work.(UPGWD SOR) |
| 12 | Development of bore well by 3 HP submersible pump. (UPGWD SOR) |
| 13 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.. (DSR 2.8.1) |
| 14 | 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources :8 graded stone aggregate 40 mm nominal size derived from natural sources. (DSR 4.1.8) |
| 15 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources..DSR (4.1.3)0.8 m x 0.8 m x 1.50 m = 0.96 cum0.60 m x 0.60 m x 0.15 m = 0.054 cum |
| 16 | Fabrication & fixing of Security System as per design including cost of material, labour, etc. required for proper completion of work. (UPGWD SOR) |
| 17 | Fabrication & supply of angle Iron Sign board of frame size 1.20x0.90x1.95 mt. with cross strip & beading of size 30x4 mm welded on frame of MS angle size 40x40x5 mm and MS sheet of 18 gauge as per drawing & design including all labour, material and T&P etc. complete. (UPGWD SOR) |
| 18 | Fixing of legs of sign board on cement concrete block of size 0.30x0.30x0.60 mt. in ratio 1:3:6 as per drawing & design including all labour, material etc. complete. (UPGWD SOR) |
| 19 | Painting of angle iron sign board with double coat primer and enamel paint of black colour on frame both side and sky blue on MS sheet both side including all labour, materialetc. complete. (UPGWD SOR) |
| 20 | Writing on angle iron sign board both sides of given matter with Post Office Red Color Fluorescent Paint as per drawing and detail given including all labour, material etc. complete. (UPGWD SOR) |
| 21 | Loading/Unloading & transportation of material, T&P including all labour etc complete. (UPGWD SOR) |
| 22 | Tentage charges (UPGWD SOR) |
| 23 | Reduce Level Survey Work for fixing of Latitude, Longitude including all labour, T&P etc. as required. (UPGWD SOR) |