Tender For Construction Of Any Cut Barah Haveli , Villege -Barah Haveli, Block - Kada , District Kaushambi. - Dewatering Work By 5 Hp Diesel Pump Set With Operator & P.O.L. 2 (I Lift) Making Diversion Drain With O/Soil Up To 1.50 M. Lift & 30M.Lead I/A, Kaushambi-Uttar Pradesh
TDR : 52011781
Tender Notice
BOQ
Expired
Kaushambi
Uttar Pradesh
Tender For Construction Of Any Cut Barah Haveli , Villege -Barah Haveli, Block - Kada , District Kaushambi. - Dewatering Work By 5 Hp Diesel Pump Set With Operator & P.O.L. 2 (I Lift) Making Diversion Drain With O/Soil Up To 1.50 M. Lift & 30M.Lead I/A
Name of Work: ConstructionOf Any cut Barah haveli , villege -barah haveli, Block - kada , District Kaushambi.
Sl. No.
Item Description
1
Dewatering work by 5 HP Diesel pump set with operator & P.O.L.
2
(i lift) Making Diversion drain With o/soil up to 1.50 m. lift & 30m.lead i/all complet.
3
(ii lift) Making Diversion drain With o/soil up to 1.50 m. to 1.80 m. lift& 30m. lead i/all complet.
4
(i lift) Earth work excavation in ordinary soil / kanker mixed hard soil I/c Up to 1.50 m. lift and 30 m. lead
5
(ii lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 1.50 m. to 1.80 m lift and 30 m. lead
6
Removal of slush from nala bed before excavation s.soilUp to 2.40 m. to 2.70 m lift and 30 m. lead
7
Earth work excavation in foundation in mar kabar ordinary & kanker mixed saturated soil crest, wing wall etc. Beyond 1.50 lift and 30 m. lead
8
P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
9
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in foundation.
10
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure.
11
P.C.C. Work with 1:2:4 (cement,c/sand & 10-20 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
12
Plaster work 1:3 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
13
Raised pointing work 1:2 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
14
Laying of dry stone boulder filling in inverted filter including cost of material, labour etc.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.