| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :A)All kinds of soil |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete |
| 3 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : (a) All works upto plinth level |
| 4 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. |
| 5 | Centering and shuttering including struttings propping etc. and removal of formwork for (a) Foundations, Footings, Bases for columns |
| 6 | vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. |
| 7 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge |
| 8 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. |
| 9 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation rom drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 as per MORTH specification 305 |
| 10 | Transportation and carriage of materials (A) By tipper truck including, loading, unloading and stacking (A) Lime,building rubbish, manure sludge, moorum excavated rock ( i ) Lime,moorum, building rubbish Earth upto 5 km Please Enable Macros to View BoQ information |