Tender For Electrification In Renovated Type-E Bunglow & Replacement Of Service Panels In Type-D Spl. Buildingsin Barc Staff Colony, Tarapur.;  1 Removal and Modification work  2 Removal of complete concealed/surface switch boards, Holders, Celling rose and other electrical fittings in the Type-E banglow in BARC Staff Colony, Tarapur. Total nos. of flats- 10 Set.(aprrox. 29Nos. switch boards, 23Nos. Holders/Celling rose, 01No. Geyser, cassing cappingetc.)  3 Removal of07Nos. Celling fan , 03Nos. Exhaust Fan , 01No Geyser ,07Nos. LED batten and re-fixing the same after complete renovation of the flat in the Type-E banglow in BARC Staff Colony, Tarapur. Total nos. of flats- 10 Set.  4 Supply, installation and Guarantee of 1.1KV grade, FRLS PVC insulated wire of following size and laying through casing caping or pulling through conduit pipe safely with out any joint in wire.All wires should be confirm IS:694 with latest amendments. (Red/Yellow/Blue, Black, Green colour)  5 Supply and Guarantee of 1.5 mm², flexible Multistrand single core copper wire  6 Installation  7 2.5 mm², flexible Multistrand single core copper wire  8 Supply and Guarantee of2.5 mm², flexible Multistrand single core copper wire  9 Installation  10 4 mm², flexible Multistrand single core copper wire  11 Supply and Guarantee of 4 mm², flexible Multistrand single core copper wire  12 Installation  13 6 mm², flexible Multistrand single core copper wire  14 Supply and Guarantee of 6 mm², flexible Multistrand single core copper wire  15 Installation  16 Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc. as required. Civil work required for concealed the box is in scope of the contractor.  17 12 Module (200mmX150mm)  18 8 Module (125mmX125mm)  19 6 Module (200mmX75mm)  20 4 Module (125mmX75mm)  21 3 Module (100mmX75mm)  22 2 Module (75mmX75mm)  23 1 Module (75mmX75mm)  24 Replacement of switches/sockets/telephone socketsSupplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required in Type-E banglow in BARC Staff Colony, Tarapur. Total nos. of flats - 10Nos.  25 15/16 A switch  26 6 pin 15/16 A socket outlet  27 5/6 A switch  28 3 pin 5/6 A socket outlet  29 Telephone socket outlet  30 Bell Push  31 Supplying and fixing modular blanking plate on the existing modular plate & switch box excluding modular plate as required.  32 Supplying and fixing call bell/ buzzer suitable for single phase, 230 V, complete as required.  33 Supplying and fixing PVC batten/ angle holder including connections etc. as required.  34 Supplying and fixing 3 pin, 5 A ceiling rose on the existing junction box/ wooden block including connections etc. as required.  35 Supply& Installation ofPVC Round Plate for fixing angle holder/Ceiling rose/Junction  36 PVC ConduitSupplying and fixing of 25mm of medium class PVCconduit along with accessories in recess includingcutting the wall and making good the same in case of recessed conduit as required.  37 Replacement of old Distribution Board: Removing of old Distribution Board and replaced with new DB by Supply installation, testing and commissioning of 4 way , Double door, GI sheet steel, TPN MCB distribution board, 415 V,recess mount, complete with tinned copper bus bar, neutral bus bar, earthbar, din bar, Pre-wired with FRLS Cooper wire, powder coated with RAL7032 shad, 2mm thick removable gland plate on both top and bottom side, neoprene gasket, check-nuts, earthing etc. as required. (But without MCB/RCCB/Isolator). Civil work required for concelead the DB box is in scope of the contractor.  38 Supplying and fixing Cable End Box (Loose Wire Box) suitable For 4 way, Double door TPN MCB DB,onrecess, complete with testing and commissioning etc. as required. Civil work required for concelead the DB box is in scope of the contractor.  39 Supply installation, testing and commissioning of 32A , 4 Pole, 415V , RCBO(30mA) installed in the existing DB.  40 Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, C curve, SP MCB suitable for inductive loadin the existing MCB DB complete with connections, testing and commissioning etc. as required.  41 Removal of old Meter Box and replace with new Meter Box by Supply installation, testing and commissioning of Meter Box of size 600 x 600 x 200mm fabricated out of 2 mm thickGI sheetwith lockable (padloak) hinge door duly painted with powder coating mounted with 100 Amp, Icu=30-36kA, 4P MCCB complete with spreader link and separators as Incomer – 01 No, 63Amp TPN MCB Outgoing – 01 No, 3 Phase 4 wire KWH Meter 5-30 Amp, 415 Volt, class-1 - 01 No.,25 A, 230 V, 2-pin, SPN MCB suface mounting, safty shutter metal box socket- 01 Nos. installed on mounting plate inside the box complete with wiring, earthing, Nuetral link etc. Enclosure shall have weather proofness of IP 54 and it is suitable to wall mounted surface type.  42 Removal of old Meter Box and replace with new Meter Box by Supply installation, testing and commissioning of Meter Box of size 600 x 600 x 200mm fabricated out of 2 mm thickGI sheetwith lockable (padloak) hinge door duly painted with powder coating mounted with 100 Amp, Icu=30-36kA, 4P MCCB complete with spreader link and separators as Incomer – 01 No, 63Amp TPN MCB Outgoing – 01 No, 3 Phase 4 wire KWH Meter 5-30 Amp, 415 Volt, class-1 - 01 No.,25 A, 230 V, 2-pin, SPN MCB suface mounting, safty shutter metal box socket- 01 Nos. installed on mounting plate inside the box complete with wiring, earthing, Nuetral link etc. Enclosure shall have weather proofness of IP 54 and it is suitable to concealed type in wall. Civil work required if any to concealed the panel is in scope of the contractor.  43 Removal of old Meter Box and replace with new Meter Box by Supply installation, testing and commissioning of Meter Box of size 600 x 800 x 200mm fabricated out of 2 mm thickGI sheetwith lockable (padloak) hinge door duly painted with powder coating mounted with 100 Amp, Icu=30-36kA, 4P MCCB complete with spreader link and separators as Incomer – 02 Nos, 63Amp TPN MCB Outgoing – 02 Nos, 3 Phase 4 wire KWH Meter 5-30 Amp, 415 Volt, class-1 - 02 Nos.,25 A, 230 V, 2-pin, SPN MCB suface mounting, safty shutter metal box socket- 01 No. installed on mounting plate inside the box complete with wiring, earthing, Nuetral link etc. Enclosure shall have weather proofness of IP 54 and it is suitable to concealed type in wall. Civil work required if any to concealed the panel is in scope of the contractor.  44 Removal of old Service Paneland replace with new Service Panelby Supply and installation of Service Panel of size 1600 x 1250 x 250mm fabricated out of 2 mm thick GI sheet with best quality lockable (padlock) hinged door, duly painted with powder coating, mounted with following switchgears on mounting plate inside the box complete with wiring, earthing etc. Enclosure shall be weather proof of IP 43. Civil work if any required is in contractor scope. ie plastering , finishing and painting.06 Nos. in Type D Spl.i) 160 Amp, Icu=35kA, 3P MCCB with Nuetral link complete setwith spreader link, separator as Incomer – 01 No. ii) 100 Amp, Icu=30-36kA, 3P MCCB complete with spreader link and separatorsOutgoing – 01 Nos. iii) 32Amp SP MCB, Outgoing – 09 Nos.v) 25 A, 230 V, 2-pin, SPN MCB suface mounting, safty shutter metal box socket- 01 Nos. per SPB. vi) 1 Phase energy meter (electronics)5-30 Amp, 415 Volt, class-1, with optical port= 08 (for flats) + 01 (for Spare) Total = 09 Nos.vii) 0-500V analog voltmeter of 96 mm² size with 3 ways & OFF position selector switch and protective fuses- 1 Set. viii) 0-100A Digital ammeter 96 mm² size, complete with CTs and 3 ways & OFF position selector switch and protective fuses- 1 Set.ix) LED based RYB indicator for supply indication- one set of three indicators (Red / Yellow / Blue - one each) x) TPN Cu Busbar suitable to 200 Amp AC including enclosure – 01 set.Note : For the above Service panal, GA Drawing should be approved by EIC before sent to fabrication. Inspection is required at fabrication stage, assembled stage and final stage atmanufracturer work place, before the delivery.