Tender For Maintenance of HT & LT Switchgear Including Electrical Maintenance of ESP of 3x210 MW ATPS - Part-A- Routine & Breakdown maintenance of electrical system ESP of unit #I/II/III 2 Upkeep of floor and equipment of ESP of unit I, II, III.1-Floors, doors & windows panels of 01 No., switchgear room 01 No., control roomfor each ESP. 2- Daily upkeep externally (As per scope of work) (a) Electronic controller panels-28 Nos. each unit.(b)Switchgear/MCC/Panel Boards-02 Nos. each unit. (c)MCC forheater & rapping motors-04 Nos. each unit. 3 Routine Maintenance of electrical system of ESP of unit I, II, III(1)High voltage rectifier transformers-3 x 28 Nos(2) Electronic controller panels - 3x28 Nos. (3) Rapping motors emitting/collecting - 3x56 Nos.(4) ESP Switchgear - 3x2 Nos. (5) MCC for rapping motor - 3x4 Nos.(6) JBs (located at various floor between 0 meter to HVR Floor - 3x56 Nos. (7) Various heaters (Hopper heater) 3x28x12, shaft insulation heater 3x28, support insulator heater 3x28x4 Nos. (8) Motors for RVF - 3x16 Nos. 4 Air testing of fields (28 Nos.) of ESP and fault removing if any and preventive maintenance of control panels and MCC etc. during S/D of unit. 5 Breakdown maintenance of H.V.R. transformer including replacement of oil /gasket/valve/buchholz relay/card/gauges etc. 6 Dismantling & Shifting of H.V.R. Transformer & Disconnecting switches for replacement of field electords laying below the transformer & then re-erection & re-commissioning. 7 Replacement ofdefective part of disconnecting switches (Knife switches) such as ferrules/ connectors/ insulators etc. 8 Complete overhauling of 62.5KVA, BHEL make HVR transformer of ESP. 9 PART A Routine maintenance of electrical system of soot blowers 10 Routine maintenance of electrical system of soot blowers of 3x210 MW, ATPS, Anpara. (monthly rate to be quoted) 11 PART B Break down maintenance of electrical system of soot blowers 12 Break down maintenance of control circuit of LRSB / wall blowers. 13 Repair / Servicing of Limit Switches of wall blowers. 14 Repair / Servicing of Limit Switches of LRSB. 15 Repair / Servicing of actuator / element of LRSB / Wall blower 16 PART C- Testing, calibration and setting of English Electric/Jyoti make over current relays, Earth fault Relays, Under voltage Relays, Differential Relays,Auxiliary Relays etc. 17 CTMM Relay 18 VAGM Relay 19 VAG/CAG Relay 20 VAA/VTT Relay 21 DIFFERENTIAL Relay 22 PART D- Repair, Calibration and Testing of Electronic cards/ modules of ESP, DC System of 3X210 MW,ATPS,A NPARA 23 Power supply modules 6 EV 1410-4AC 24 Power supply Regulator card 6 FV 3200-OD 25 Firing circuit card 6 DC 1400-ICC 26 Reference Integrator card 6 DC 2005 - BC 27 FB / UB Circuit card PC 263 - S 28 Spark rate control PC 264 - S 29 Blocking circuit card PC 265 -S 30 Annunciation circuit card PC- 266- S 31 Spark counter circuit card PC -267 -S 32 Spark detention circuit card PC -268 -S 33 Feed back rectifier PC-272-S 34 Gate circuit card PPL -204 -300 -201 35 High voltage Rectifier card 36 Automatic voltage regulation card for 220 V DC/+V DC Trickle charger ERC 555 37 Automatic Voltage Regulator card for H2 gas generating plant. 38 Part-E (6.6 KV System Breakdown Work) 39 Breakdown maintenance due to flashover in any panel or on a portion of Bus bar including replacement of the damaged parts, reassembling of the section and re-commissioning after achieving I.R. values. 40 Breakdown maintenance of 1250A/2000A Jyoti make MOCB including replacement of damaged / defective parts. 41 Arresting the oil leakage of 1250A/2000A Jyoti make MOCB from any portion of pole parts including toping of centrifuesed oil in the chamber. 42 Rectification of the electrical problem associated with trip / close of breakers / permissive/indication circuit including servicing / replacement of defective parts like contactors/limit switches / connectors T/Bs. Etc. inside the breaker ckt. 43 Repair / replacement of defective mechanical parts and hence removing any obstacle related to correct positioning / placement of breakers inside the cubicle. 44 Repair / replacement of damaged / defective switches such as local / remote or trip / close or Auto Manual etc. of cubicle / panels. 45 Replacement of damaged / defective C.Ts. and checking / testing with associated circuit. 46 Replacement of defective protection Relays / contactors etc. & rectification of the associated circuit fault. 47 Break down maintenance of control ckt. Panel of plant air compressor motors. 48 Repair / replacement of emergency push buttons / local start – stop buttons / meters of 6.6 KV motors. 49 Repair/Replacement of spring charging of motor starter 50 Disconnection & connection, replacement of differential CTs and testing after Breakdown of any auxiliaries/CTs 51 Part-G(0.4 KV System Breakdown WorkS) 52 Break down maintenance due to fire or flashover on any portion of the bus bar of 0.4 KV systems including reassembling of the section and re-commissioning after achieving I.R. values. 53 Break down maintenance of L&T/EE/GE make breakers of 0.4 KV system including replacement of damaged / defective parts. 54 Break down maintenance of 0.4 KV motor feeder modules including fault finding of control circuit & replacement of damaged / defective parts like contractors/EMRs/Switches/Fuse carriers etc. and tightness of cable termination at MCC and motor both the end. 55 Break down maintenance of 0.4 KV modules other than motor feeders including replacement of damaged/defective parts like switches/fuse carriers etc. 56 Replacement of protection relays / bus CT/ Bus PT etc. including rectification of the fault of associated circuit. 57 Checking & replacement of damaged heaters, its control circuit parts & re-commissioning of dryers of Instruments air compressors. 58 Break down maintenance of control circuit panel of Instrument Air compressor motors. 59 Break down maintenance of local control panel for scraper conveyor / clinker grinder / CMR including fault finding of control circuit, replacement of defective parts & set right the local as well as remote operation. 60 Repair / replacement of defective switches such as local / remote, trip / close auto / manual etc. of Bus Bar cubicle or panels. 61 Break down maintenance of clarifloculator bridge panels & supply through commutator and carbon brushes of PT-1 / PT-2. 62 Break down maintenance of lime & alum. Dozing agitator mixture starter and TPN switches of A/B filtration plant. 63 Break down maintenance of star delta starter & TPN switches of 135 KW. Water supply motors in filtration plant. 64 Break down maintenance of control circuit panels (LCC) of 0.4 KV system of ancillaries including fault finding of control circuit, replacement of defective parts like contactors, BMRs/Switches/Push buttons / starters / Bulb holders / fuse carriers etc. and re-commissioning of the system for its local and remote operation and healthy indication circuit. 65 Repair / replacement of emergency push buttons / local start-stop push buttons / meters of 0.4 KV Motors. 66 Repair of rectifier unit of H2 plant including fault finding of circuit and replacement of defective parts and re-commissioning. 67 PART H- Checking and rectifying the fault in control panels and testing of interlock protection, local / remote of :- 68 Ash water pump house. 69 Ash slurry pump house. 70 Replacement of defective timer, contactor,relays,fusebase etc in panel 71 Electrical breakdown maintenance of sump pump 72 PART I- Routine servicing / Breakdown maintenance of 0.4 KV EE, GE and L&T make Air Circuit Breakers 73 Routine servicing / Breakdown maintenance of 0.4 KV EE, GE and L&T make Air Circuit Breakers of 3x210 MW ATPS Anpara 74 PART J- Levelling & alignment of 6.6 KV Minimum Oil Circuit Breakers(MOCB) 75 Levelling & alignment of 6.6 KV Minimum Oil Circuit Breakers(MOCB) Of 3x210 MW ATPS Anpara. 76 PART-K Upkeep of 6.6 KV, 0.4 KV switchgears, MCC, DC system and DG Set etc. of 3x210 MW, ATPS, Anpara 77 Category (A)-UPKEEP OF FLOOR AND PANELS (EXTERNALLY) OF 0.4 KV. SWITCHGEAR OF UNIT I/II/III & ANCILLIARY SYSTEM EXCLUDING C.H.P 78 Alternate days upkeep of floor area of 0.4 KV Switchgear, different MCC of Unit No. I, II & III as mentioned in Annexure A (1) & A (2). 79 Weekly upkeep of electrical panels (externally) as mentioned in Annexure A (3) & A (4) . 80 Category (B)- Upkeep of floor andpanels(externally) of6.6 KV switchgear of Unit No. I, II, III, CWPH, ASH slurry etc. of A TPS (excluding CHP) 81 Alternate days upkeep of floor area of 6.6 KV switchgear of Unit No. I, II, III, and CW Pump house, Ash handling etc. as mentioned in Annexure B (1). 82 Upkeep of ceiling of switchgear rooms as mentioned in Annexure A(1),A(2) B(1) (01 day in a month) 83 Weekly external upkeep of S/G Board / panels / cabinet as mentioned in Annexure B(2) 84 Category ( C)Upkeep ofMCC, DC system and DG Set etc. 85 Daily upkeep of floor of Battery Room of Units as well as ATRS Batteries and DG set Room as mentioned in Annexure-C under itemC(1) 86 Upkeep of site offices of this division 87 Category(D) 88 Weekly external upkeep of a system mentioned in Annexure-C under item D(1) 89 Category ( E) 90 Quarterly internal upkeep of DC/DG system mentioned in Annexure-C under item E (1) 91 Complete washing of filter line and replacement of filters of DG set of all three units including removal of sludge from Diesel tank of DG sets 92 Uprooting of grass / shrubs / bushes around site stores / office of this division area 100x100 Sqm