| 1 | Dismantling of old Existing Cc Road i/C including stacking of material as directed by the Engineer-in-charge with-in-charge with in distance of 60 meeter (200 fee) |
| 2 | Dismantling of oldand damage 3rd class brick wall including stacking of material as directed by the Engineer-in-charge with-in-charge with in distance of 60 meeter (200 fee) |
| 3 | Dismantling of reinforced cement concrete or columns including stacking of material as directed by the Engineer-in-charge with-in-charge with in distance of 60 meeter (200 fee) |
| 4 | Dismantling of corrugated Iron roofs, wall or partition i/C including stacking of material as directed by the Engineer-in-charge with-in-charge with in distance of 60 meeter (200 fee) |
| 5 | Disposal of dismentling C.C road material with cartage uptoloading and unloading including supply of all material,labour and T&P etc.required for proper completion of work. As per S.I. No. 231(a). |
| 6 | Earth work in excavation in ordinary soil including lift upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work |
| 7 | Concrete in 1:4:8 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. |
| 8 | Cement concrete with 4cm gague approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2cm gaguge stone gritt instead of 4cm gauge stone ballast inculding supply of all materials labour and T&P etc for proper completion of work.As par |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage inraft foundation i/c supply of all material,labour and T&P etc.including all complete of work |
| 10 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in plinth beam,tie beam i/c supply of all material,labour and T&P etc.including all complete of work |
| 11 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Columni/c supply of all material,labour and T&P etc.including all complete of work |
| 12 | Mild steel or Iron work such as reinforcedincludingsupply of all material,labour and T&P etc.required for proper completion of work |
| 13 | M-150 brick work in 1:6 with (one cement and three fine sand of 1.25 F.M mortar) in foundation i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work. |
| 14 | Supply and laying 6-8mm thick Vitrified floor tiles including supply of all material,labour and T&P etc.required for proper completion of work |
| 15 | Providing & fixing retro-reflective sign boards comprising of customised modular PU Epoxy coated MS Angle iron frame work,Aluminium composite panel (ACP) as base board micro prismatic retro reflective sheet and electro cut colored overlay film/latex printing ,the horizontal & vetrical member including,The Retro reflective sheting shall be tested for 3 year outdoor weathering test in indian conditions as per IRC 67-2012 & proof of the same in form of goverment report shall be uploaded with quoting tender.The rate include all Material,labour,equipments ,fabrication,transportation,errection, intallations and inclidentals all complete as per direction of the Engineer-in-charge. |
| 16 | Supply & fixing S.S 304 grade yatri shed (size 20\"x10\") as per attched photograph (consist of 6\" O circular hollow S.S pipe columns with horizontal supports 5\" O circular hollow S.S pipe with supporting brackets for supporting of poly carbonated S.S sheet and including 10 Mtr SS Sitting benches includng all complete of work. |
| 17 | Supply & Fixing of Foundation / Inauguration boardgranite stoneincluding supply of all material,labour and T&P etc required for proper completion of work |
| 18 | Supply & Fixing of Foundation / Inauguration boardgranite stoneincluding supply of all material,labour and T&P etc required for proper completion of work |
| 19 | Supply & Fixing of Foundation / Inauguration boardgranite stoneincluding supply of all material,labour and T&P etc required for proper completion of work |
| 20 | Supply & Fixing of Foundation / Inauguration boardgranite stoneincluding supply of all material,labour and T&P etc required for proper completion of work |
| 21 | ADD GST @18% |