| 1 | Work for ICP Sonuli Maharajganj releasing 1500 KVA |
| 2 | Safely Carriage, Cartiage and erection of following Centralised Materials from store to work location as per norms |
| 3 | STP 11 Mtr Long |
| 4 | ACSR Weasel conductor |
| 5 | 11 KVV Type cross arm |
| 6 | 11 kv pin insulator with nut |
| 7 | Earthing Complete |
| 8 | M.S. Angle Iron for cross bracing |
| 9 | M.S. Channel Top |
| 10 | 11 KV Disc Insulator with Nut |
| 11 | Stay complete |
| 12 | 11 KV Polymer Disc Insulator |
| 13 | G.I. Pipe dia 6\" |
| 14 | Cable Kit |
| 15 | 11 KV Outgoing feeder VCB |
| 16 | 3X185 sqmm XLPE Cable (Double circuit) |
| 17 | 11 KV cable Jointing Kit (Outdoor) |
| 18 | 11 KV cable Jointing Kit (Indoor) |
| 19 | 11 KV Pilfer Proof Metering Cubical |
| 20 | Energy Meter 11 KV TVM Type |
| 21 | Supply and Installation of following Decentralised Materials as per specification. |
| 22 | Cross Arm Holding Clamp With N/B |
| 23 | F Braket with N/B |
| 24 | Alluminium Tape |
| 25 | Alluminium binding wire |
| 26 | Gaurding Angle with Clamp |
| 27 | G.I. wire for Gaurding |
| 28 | Top channel clamp with N/B |
| 29 | Nut&Bolt Various size |
| 30 | Cross Bracing Clamp with N/B |
| 31 | XLPE Cable Clamp |
| 32 | Work as per specification |
| 33 | Grouting of Pole with all fitting |
| 34 | Concreating of stay |
| 35 | Lying of XLPE Cable for HDD Machine |
| 36 | Stringing and Sagging of ACSR weasel conductor |
| 37 | Installation of Earthing complete |
| 38 | Installation of stay set complete |
| 39 | Installation of GI Pipe 6\" |
| 40 | Installation of Outgoing Panel |
| 41 | Installation of 3x185 sqmm XLPE Cable double circuit |
| 42 | Installation of Jointing Kit Outdoor |
| 43 | Instalation of Joiniting Kit Indoor |
| 44 | Instalation of 11 KV Pilfer Proof Metering Cubical |
| 45 | Instalation of Energy Meter 11 KV TVM Type |