| 1 | Excavation for Structures:-Earthwork in excavation for structures as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleteriousmaterial and disposing ofsurplus, un-serviceable Excavated earthas directed at site for safe disposal of same without damaging private/public property, dressing of sides, bottom and backfilling in trenches with excavated suitable material including de watering if required. |
| 2 | Providing and laying of plain cement concrete of Grade M-10in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203.including all leads, lifts and carriages of materials by MT complete. |
| 3 | Providing and laying of plain cement concrete of Grade M-15in open foundations complete as per drawings & Technical specification Clauses802, 803, 1202 & 1203. Including cost of curing, form work, all leads and lifts and carriages of materials by MT complete. |
| 4 | Providing and laying of plain cement concrete of Grade M-20in open foundations complete as per drawings & Technical specification Clauses802, 803, 1202 & 1203. Including cost of curing, form work, all leads and lifts and carriages of materials by MT complete. |
| 5 | Back filling behind abutment , wing wall and return wall as per drawings and technical specification clause 1204.3.8including all leads, lifts, carriages of materials by MT handling and re-handling complete. ( With Available Stone) |
| 6 | Earth filling in foundation trenches as per drawing and technical specification clause 305.3.9 |
| 7 | Providing andlaying of boulder apron laid in wire crates with 4 mm dia G.I wire conforming to IS:280 and IS:4826 in 100 mm x 100mm mesh (woven diagonally) including 10% extra for laps and joints weighing not less than 25 Kg each as per drawings & Technical specification Clause 1301 including all leads, lifts, carriages of materials by MThandling, re-handlingand including cost of wire crates complete. |
| 8 | Polygonal/Random Rubble Masonry laiddry un coursed brought to course in sub structure including cost of bond/through stones, including all leads, lifts, carriages,of materials by MT handling and re-handling complete |
| 9 | Providing /Laying plain/reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection work, backfilling concrete and masonry works in head walls and parapets clause 1106 (1000mm dia) |