| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 50 Km. :– (As per direction of Supervising Engineer). |
| 2 | 1-P.C.C.Pole 11 mtr. Long |
| 3 | 2- PCC Pole 8.5 Mtr Long |
| 4 | 3- STP Pole 11/13 Mtr long. |
| 5 | Line Material Such as 11 K.V.Cross Arms/11 KV Pin Insulator/Conductor/GIWire/MS Angle & MS Channel/Stay Wire/stay Road, Disc fitting/Earthing Road etc. |
| 6 | Cartage of following material from JE Store to site including loading & unloading at both ends maximum distance up to 15 Km. 1-P.C.C.Pole 11 mtr. Long |
| 7 | 2- PCC Pole 8.5 Mtr Long |
| 8 | 3- STP Pole 11/13 Mtr long. |
| 9 | Line Material Such as 11 K.V.Cross Arms/11 KV Pin Insulator/Conductor/GIWire/MS Angle & MS Channel/Stay Wire/stay Road, Disc fitting/Earthing Road etc |
| 10 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.)1-63 KVA to 100 KVA |
| 11 | 2-10 KVA to 25 KVA |
| 12 | Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.)1-63 KVA to 100 KVA |
| 13 | 2-10 KVA to 25 KVA |
| 14 | Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long ST pole 11/13 mtr long. including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. 1-P.C.C.Pole 11 mtr. Long |
| 15 | 2-PCC Pole 8.5/ STP Pole 11 Mtr.Long |
| 16 | Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs Including fabrication of Structure as per RESPO norms. |
| 17 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. |
| 18 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. 1-Dog Conductor |
| 19 | 2-Weasel Conductor. |
| 20 | Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. |
| 21 | Providing & fixing of cross arm holding clamp for PCC Pole/STP made MS flat of size 50X6mm with nut & bolt. |
| 22 | Providing & fixing of GI Pipe6 Inch |
| 23 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 24 | Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line. 1-63 KVA to 100 KVA |
| 25 | 2-10 KVA to 25 KVA |
| 26 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect.1-LT Pin Clamps with nut & bolt. |
| 27 | 2-Shackle Insulator with nut & bolt. |
| 28 | 3-Double Pole Clamps with nut & bolt. |
| 29 | Providing and fixing F Clamp. |
| 30 | Providing & fixing of cross arm holding clamp for PCC Pole/STP made MS flat of size 50X6mm with nut & bolt. |
| 31 | Providing and fixing Piercing Clamp. |
| 32 | Providing and fixing Dead & End Clamp. |
| 33 | Providing and fixing Bolt and Nuts. |
| 34 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. |
| 35 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 36 | Making section T-off for 11 KV/LT Line. |
| 37 | Sundry Items Road Crossing Under Ground 11 KV Line |
| 38 | Cutting & Chopping of tree branches. |
| 39 | Jumpering of 11 KVHT/LT Line at different places/T points. |
| 40 | Grouting of PCC/ST poles with Dust, Cement &Stone blast concretibg as per norms. |
| 41 | Fixing of Fuse Set at D/P. |
| 42 | Cartage of ABC Cable with junction Box & other store materials related with the work of ABC for each site/Transformer. |
| 43 | Fixing of Junction Box & making connection & other related works. |
| 44 | Laying lifting & sagging of LT line with A.B.C Conductor of different size including proper binding & jumpring |
| 45 | Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories . |
| 46 | Cartage of 11KV CT/PT Unit &11 KV Pilfer Proof Cubicalfromsite of work to J.E. store to Centarl Store including loading & unloading at both ends (Maximum Distance up to 50 km.)1-11 KV CT/PT unit of Different size2-11 KV Pilfer proof Cubical of Different size |
| 47 | Cartage of 11 KV XLPE Cable of Different size from central store Meerut to 33/11 KV S/S. (distance up to 50 KM approx.) including loading & unloading at both ends (Length cable upto 50 meter each or part their off). |
| 48 | Cartage of Dissmentling PCC Pole 8.5/ Mtr/ST P Pole 11/13 Mtr fromsite of work to J.E. store to Centarl Store including loading & unloading at both ends (maximum distance up to 50 km.) |
| 49 | Laying of 11 KV CT/PT unit of Different size |
| 50 | Laying of11 KV Pilfer proof Cubical of Different size |
| 51 | Cartage of Weasel/Rebbit/Dog /LT ABC /Irom Scarp/Different size Conduter fromsite of work to J.E. store to Centarl Store Including loading & Unloading at both ends (Maximum Distance up to 50 km.) |
| 52 | Laying lifting Stringing of Proper Sagging of 11 KV XLPE Cable of Different sizes with filling Jointing kit Different size. |
| 53 | Fabrication of cable Jointing/termination kit. |