Corrigendum for 2nd due date extend for 2.5 Km. 11 KV line Cond. Aug. work DOBI to AMON Pump under Shahganj D/c of (OandM) Budni
Date
12-11-2025
2
30-10-2025
Corrigendum for due date extend for 2.5 Km. 11 KV line Cond. Aug. work DOBI to AMON Pump under Shahganj D/c of (OandM) Budni
Date
05-11-2025
Name of Work:
Sl. No.
Item Description
1
140 Kg.,8.0 Mtrs. long PCC pole
2
AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.)
3
M S Angle 65X65X6 mm
4
M S Channel 100X50x6 mm
5
M S Channel 75X40x6 mm
6
11 KV Pin Insulator Polymer Composit (5 KN)
7
11 KV(45KN) Composite Polymer Disc Insulators
8
11 KV Strain hardware (T&C type) fittings
9
M.S.Flat 50x6 mm
10
Red oxide paint
11
Aluminium paint
12
Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire
13
Back filling of poles with boulders.
14
G.I. WIRES 4.0 MM. (8 SWG)
15
Danger Boards Enamelled 11 KV
16
Aluminium Binding wire and tape
17
Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor
18
M.S.Nuts with Bolts
19
Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG)
20
Stone Block/Pre cast block for base pedding(450X450X75MM)
21
Additional Erection Charge
22
Dismentelling
23
CONDUCTOR ACSR SCRAP( Return material Side To Area Store BHOPAL )
24
Labour Charges & all Fabrication Charges (STC Sub Division will provide the raw material like M.S. angle, M.S. Channel, M.S. flat, etc. to the contractor and the contractor will fabricate the itemslike V-cross arm, Top clamp, D.C. Channel, clamp, etc. as per site condition. Those fabrication charges are included in the Labour charges.) no extra amount will be paid.
25
Transportation Charges for All Equipments & Materialsfrom area store to site & Site to Area store Bhopal
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.