}

Tender For The Work Of Construction Of 11 Kv/Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Eudd Hathras - Safe Carriage Of Following Material From Electricty Store Centerhts To Pit Site Of Work Through The Kacha And Pakka, hathras-Uttar Pradesh

Tender Notice

51926641
Tender For The Work Of Construction Of 11 Kv/Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Eudd Hathras - Safe Carriage Of Following Material From Electricty Store Centerhts To Pit Site Of Work Through The Kacha And Pakka
Tender
Indian
Uttar Pradesh
Hathras
25-10-2025

Tender Details

Tender For The Work Of Construction Of 11 Kv/Lt Line And Other Associate Work Under Full Deposite Scheme At Various Place In Eudd Hathras - Safe Carriage of following material from Electricty store centerHts to Pit site of work through the Kacha and Pakka road includingloading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) 2 Pcc Pole 8.5 Mtr. Long 3 STP Pole 9/11 Mtr. Long 4 Teeoff Channel with N&B 5 Earthing set complete 6 V type X arm 7 11 KV Pin Insulator with Pin 8 11 KV Disc Insulator with fitting 9 LT XLPE/PVC Cable 10 AB Cable 11 XLPE Cable 12 T/F Base Angle 13 Cable Jointing Kit 14 ACSR Weasel Conductor 15 Top Channel 16 Dropper Channel 17 Stay set Complete 18 250 KVA 11/0.4 KV T/F 19 100 KVA 11/0.4 KV T/F 20 TPMO 21 Fuse Set 22 Suspension Clamp 23 Distribution box complete 24 Pearcing Connector 25 Dead End Clamp 26 Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 27 Pcc Pole 8.5 Mtr. Long 28 STP Pole 9/11 Mtr. Long 29 Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work 30 Teeoff Channel with N&B 31 11 KV Pin Insulator with Pin 32 11 KV Disc Insulator with fitting 33 T/F Base Angle 34 V type X arm 35 Top Channel 36 Dropper Channel 37 Fuse Set 38 TPMO 39 Cable Jointing Kit 40 Suspension Clamp 41 Pearcing Connector 42 Distribution box complete 43 Dead End Clamp 44 Installation of250 kva T/F in proper alignment direction & making HT/LT connection. 45 Installation of100 kva T/F On newly Constructed Double Pole in proper alignment direction & making HT/LT connection. 46 Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 47 Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. 48 Laying, sagging and stringing and jumpering/binding etc. in 33 KV/11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. 49 LT XLPE/PVC Cable 50 AB Cable 51 XLPE Cable 52 ACSR Weasel Conductor 53 Providing & Fixing of Stone Pad 54 Providing & Fixing of Barbed Wire 55 Providing & Fixing of Nut,Bolt & washer 56 Providing & Fixing of Danger Board 57 Providing & Fixing of LT Incoming Panel with Metering Equipment 58 Providing & Fixing of Eye hook 59 Providing & Fixing of Different Type of Clamp 60 Providing & Fixing of LT clamp 61 Construction of plinth of size 2*2*1.5 mtr above ground level one ft below the ground level of 9 After Exavation of 4 earth brick ballast shall be provided and rammering willbe done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. 62 Pipe earthing of 250 KVA medium Power Transformers 63 Net Fencing of 250 KVA medium Power Transformers

Key Value

Document Fees
INR 3540 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail