| 1 | Supply, Cartage, Erection and Commissioning/ Installation of the following work on semi Turn Key Basis |
| 2 | Supply of Required decentralizedMaterial As per approved GTP of DVVNL/UPPCL |
| 3 | TAILLESS UNIT STAND |
| 4 | ALUMINIUM CRIMPING LUG 240 SQMM |
| 5 | ALUMINIUM LUG 200A |
| 6 | M.S. TOP CHANNEL 100*50*5*2240 MM |
| 7 | TAILLESS UNIT 500 A |
| 8 | M.S. DROPPER CHANNEL 100*50*5*2028 MM |
| 9 | CHEMICAL EARTHING OF T/F CHEMICAL EARTH |
| 10 | TRANSFORMER FENCING COMPLETE |
| 11 | NUT & BOLT |
| 12 | DEAD END CLAMP WITH EYE HOOK |
| 13 | SUSPENSION CLAMP WITH EYE HOOK |
| 14 | T/F BASE ANGLE 65*65*6*2028 MM |
| 15 | MS T OFF CHANNEL 125*65*1300 MM |
| 16 | TOP T OFF CLAMP FOR 8.5 MTR PCC POLE |
| 17 | LT CLAMP FOR STP |
| 18 | Cartage, Erection and Commissioning/Installment of 33/11 KV Line on Single/Double STP/PCC Pole & Establishment of New Transformer/Augumentation of Transformer work includes Earthing,Grouting, Laying, Sagging, Strengthing, Painting,Binding of conductor and all work required to erect the line as per Respo Manual and rates. Work includes carriage of all required line material from ESC Hasari to work site (Grouting material will be provided by the contractor)as per Respo manual and rates. |
| 19 | TAILLESS UNIT STAND |
| 20 | ALUMINIUM CRIMPING LUG 240 SQMM |
| 21 | ALUMINIUM LUG 200A |
| 22 | TAILLESS UNIT 500 A |
| 23 | M.S. DROPPER CHANNEL 100*50*5*2028 MM |
| 24 | CHEMICAL EARTHING OF T/F CHEMICAL EARTH |
| 25 | TRANSFORMER FENCING COMPLETE |
| 26 | NUT & BOLT |
| 27 | DEAD END CLAMP WITH EYE HOOK |
| 28 | SUSPENSION CLAMP WITH EYE HOOK |
| 29 | T/F BASE ANGLE 65*65*6*2028 MM |
| 30 | MS T OFF CHANNEL 125*65*1300 MM |
| 31 | TOP T OFF CLAMP FOR 8.5 MTR PCC POLE |
| 32 | LT CLAMP FOR STP |
| 33 | ACSR WEASEL CONDUCTOR |
| 34 | 11 KV FUSE SET |
| 35 | EARTH ROD 2540*20 |
| 36 | PIN INSULATOR WITH PIN 11 KV |
| 37 | D.P. CLAMP FOR POLE |
| 38 | LT AL.XLPE CABLE 1*240 SQMM |
| 39 | DISC FITTING 45KN (T&C) |
| 40 | ST POLE 9 MTR |
| 41 | G.I WIRE 8 SWG |
| 42 | GI WIRE 6 SWG |
| 43 | 11 KV POLYMER DISC INSULATOR |
| 44 | 250 KVA 11/0.4 KV TRANSFORMER NEW |
| 45 | 63 KVA 11/0.25 KV TRANSFORMER NEW |
| 46 | F BRACKET WITH BOLT & NUTS |
| 47 | 11 KV V-TYPE STEEL CROSS ARM 65*65*6 MM |
| 48 | CROSS ARM HOLDING CLAMP |
| 49 | STP POLE 11 MTR |
| 50 | 11 KV COMPOSITE POLYMER PIN INSULATOR |
| 51 | ABC(3*120+ 1*95 +1*16) SQ MM |
| 52 | LT ALU.XLPE CABLE 3.5 * 240 SQMM |
| 53 | PCC POLE 8.5 MTR |
| 54 | STAY COMPLETE |
| 55 | LT XLPE CABLE 3.5 * 70 SQMM |
| 56 | EARTHING COMPLETE |
| 57 | 3 PHASE DO FUSE SET |
| 58 | HARD ROCK PIT DIGGING |
| 59 | TRANSFROMER PLINTH2*2*1.6 |
| 60 | CONCREATING OF STAY |
| 61 | CONCREATING OF POLE/SUPPORT |