| 1 | Providing,supplying and erectionof Gazebo using approved quality brand forG.I Framework for main vertical supportof 150x150x4mm and 96x48x3.2 mm G.I tubular section as horizontal members and 50x50x3.6mmas rafter members and 25x25x2 mm as purlin withdecorative roof tiles, base plates of 200x200x8mm,150x150x8mm with average coating 87 micron G.Iwith S.S nut bolts,seating arrangement using G.I frame work of vertical section 72x72x3.2mm and connecting with 50x25x2mm and 32x32x2mm G.I tubular section with18 mm thick galaxy black granite for seating with edge moulding,side railing work of 96x48x3.2mm G.I tubular section, fixingwith 1mm thick aluminum coloured sheet toceiling ,4mm thick ACP sheet for Eave board, andtwo coat of epoxy paintafter applying a coat of epoxy primer to allG.I tubular sections,laying flooring with vitrified tiles of matt finish/antiskid, confirming to IS:15622, of approved brand & manufacturer,in all colours and shade, laid on 20mm thick cement mortar 1:4 (1cement: 4coarse sand) mix,Founadtion concrete with C.C1:1.5:3,filling in plinth with available earth,flooring with 1:3:6, including cost of all materials, labour, tools & plants,transportation,fabrication and errection charges,120 micron galvanizing to foundation bolts and plates,scaffoldingetc completeas directed . (Drawing no:GZB/2025/7/-1& GZB/2025/7/-2) . |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m ,including cost of all materials, labour, tools & plants, etc. complete as directed. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).Including cost of all materials, labour, tools & plants,etc. complete as directed. |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand).Including cost of all materials, labour, tools & plants,etc. complete as directed. |
| 5 | 12 mm cement plaster with 1:4 (1 cement: 4 fine sand)on rough side of single or half brick wall finished including cost of all materials, labour, tools & plants,etc. complete as directed. |
| 6 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. including cost of all materials, labour, tools& Plantsetc. complete. |
| 7 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport with all lead including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc.for all lift Including cost of all materials, labour, tools & plants, etc.completeas directed. |
| 8 | Providing and fixing Neelgiri/ Mexican grass turf with earth 50mm to 60mm thickness of existing filled ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light, watering,with sprinkler and maintenance for 30 days or more till the grass establish properly as per direction of officer incharge ,including cost of all materials, labour, tools & plants, accesories, tranportaion, loading and unloading charges, red earth, manure, etc. complete as directed. |
| 9 | Providing and laying50 mm diapvc drainpipe of 6kg/sqcm at 5 m c/c frommain road andmaking necessary hole in kerbstoneand fixing through brick masonry portion for rain water drainage from road including cost of all materials, labour, tools & plants,etc. complete as directed. |
| 10 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) Screened through sieve of I.S. designation 20 mm cum. including cost of all materials, labours, tools & plantsetc. complete as directed. |
| 11 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |