| 1 | Name of Work : PROVIDING PATCH WORK FOR BT ROAD FROM KALLUKATTU TO VAIGAI DAM ROAD Km : 0/0 - 0/6 R - 223 |
| 2 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 3 | Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST. |
| 4 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 5 | Provision for HM Stone |
| 6 | Name of Work : PROVIDING PATCH WORK FOR BT ROAD FROM MADURAPURI - VADAPUTHUPATTI ROAD TO ALAGAPURI ROAD Km : 0/0 - 1/180 R - 179 |
| 7 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 8 | Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST. |
| 9 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 25mm using 13.20mm IRC size HBG metal |
| 10 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 11 | Km : 0/0 - 1/0 |
| 12 | Km : 1/0 - 1/18 |
| 13 | Provision for KM Stone |
| 14 | Provision for HM Stone |
| 15 | Name of Work : PROVIDING PATCH WORK FOR BT ROAD FROM VEERAJAKKAMMALPURAM TO SAKKARAIPATTI ROAD Km : 0/0 - 2/3 R - 60 |
| 16 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 17 | Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST. |
| 18 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 19 | Km : 0/0 - 1/0 |
| 20 | Km : 1/0 - 2/0 |
| 21 | Km : 2/0 - 2/3 |
| 22 | Provision for KM Stone |
| 23 | Provision for HM Stone |
| 24 | Name of Work : PROVIDING PATCH WORK FOR BT ROAD FROM VADAPUTHUPATTI TO JJ COLONY ROAD Km : 0/0 - 0/600 R - 189 |
| 25 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 26 | Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST. |
| 27 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 25mm using 13.20mm IRC size HBG metal |
| 28 | ProvidingandlayingBituminousConcreteto25/30/40mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgsof VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specifiedgradesandcrosssectionsandconsolidatedby8-10tonneVibratorytothe required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 507 of MORTH Rev-5 |
| 29 | Provision for HM Stone |
| 30 | Name of Work : PROVIDING PATCH WORK FOR BT ROAD FROM DINDIGUL - KUMULI ROAD TO D.VADIPATTI ROAD Km : 0/0 - 1/0 R - 45 |
| 31 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 32 | Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST. |
| 33 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 34 | Provision for HM Stone |
| 35 | Provision for KM Stone |
| 36 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column \"BB\" for all works in this package} |