|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 3 | Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 4 | Coursed rubble masonry (First sort) work in cement mortar 1:3 (1 cement : 3 coarse sand) with mechanical mixer in substructure/ super structure at all levels complete as per clause 1400 and 2200 of MoRT&H specification including all material, labour, scaffolding etc but excluding pointing and plastering. |
| 5 | Providing and fixing Granite stone slab mirror polished and machineedge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc.laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3coarse sand) jointing with white cement mortar 1:2 (1white cement :2 marble dust) with pigment to match the shade of the marble slabincluding grinding, rubbing and polishing complete.27.2.3 Green / Black27.2.3.1 Upto to 1500 Cm2 Tiles sqm 2170.00 |
| 6 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 7 | Supply of 30.5M Bajaj Flag mast. Mast shaft shall be in three sections, hot dip galvanised with inhouse manufacturing and galavnised facilityand suitable for wind velocity as per IS 875 with FRP dome. Mast shall be suitable for Indian Tri Color Flag Size 30Ft X 20Ft. Mast shall be suitable for indian tri colour flag size 30 ft x20 ft.Supply of System for Raising Lowering of Flag. It Shall have double drum winch, 6mm dia galvanised wire rope and integral power tool for the raising and lowering of Flag. Suitable Control switch shall be provided for reversing operation of Power tools Motor. to assure quality , oem should have type test of wind tunnel test, type test to whinch. |
| 8 | Supply of foundation bolts manufactured from special steel along with nuts, washers, anchor plate and common template. Size- M30 x 12 nos, 850 MM long, Anchore & Template Plate PCD- 650 mm (12 Hole) |
| 9 | Supply of LED Aviation Obstruction light & AOL system which include LED Avaition system with Cu Cable size 3C x 2.5 Sqmm |
| 10 | Supply of 5M high hot dip galvanised octagonal pole suitable to mount 1no. LED 350W flood light fittings at top with suitable mounting arrangement at bottom of foundation bolts manufactured from special steel along with nuts, washers etc. (FOR 5M POLE) |
| 11 | Supply of LED floodlight type 350W, Make -Havells/Bajaj |
| 12 | Supply of national flag of size 20Ft X 30Ft in 100% knitted Polyester (140gsm), with reinforced super-strong nylon webbing on all 3 sides & rope/toggle sleeve.**There is no warranty on Indian National Flag. |
| 13 | Construction of shallow foundation with M20 grade concrete for the highmast considering the safe soil bearing capacity at site as 10 T/sqmtr at 2 metre depth with all materials and labour. |
| 14 | Construction of standard foundation for 5 Mt Poles as per design |
| 15 | Erection of the Flag Mast with the help of suitable equipments and assembly of operating system and Flag , Scope of Crane/Hydra in our scope |
| 16 | Provision of GI pipe earthing for Flag mast with 2.5 M long 40 mm dia GI Pipe including connection to High mast earth terminal with 25 x 3 mm GI flats with all materials and labour. (2nos per mast required) |
| 17 | Installation , testing, commissioning of the mast feedr pillar. |