Procurement Of Ups With Battery Banks , Supply Of Ups With Battery Banks , Design, Engineering, Manufacturing, Assembly, Testing At Shop Including Tpi, Packing And Supply Of Complete Equipment For 2 X 100% Parallel Redundant With Bypass Arrangement Dsp (Digital Signal Processing) Ups (Igbt Inverter & Igbt Controlled Rectifier), Ups Shall Be Suitable For Charging Of Both The Batteries At A Time, 415V, 3 Ph Incoming & 230V Outgoing Ac Supply, 10Kva Rating.2 Nos. Of Isolation Transformer, Each At Both Terminals I.E. Input To Inverter & Output From Rectifier Are Required As Per Sld Doc. No. P167-Sld-E001. Fat & Site Acceptance Test Shall Be Performed As Per Ups Engineering Testing Standard. , Design, Engineering, Manufacturing, Assembly, Testing At Shop Including Tpi, Packing, Supply Of Ac Ups Db (230V Ac, 63A, 19Ka For 1Sec 1-Ph, 2Wire Cu Bus Bar, 2 Nos Of 63A Dp Mccb With Volt Meter & Ammeter As Incomer Feeder, 2 Nos Of 32A Mccb, 16 Nos Of 10A Dp Mcb & 2 Nos 6A Dp Mcb As Outgoing Feeders). (Location: Electrical Room) As Per Sld, Doc. No. P167-Sld-E001 , Design, Engineering, Manufacturing, Assembly, Testing At Shop Including Tpi, Packing, Supply Of 2 X 50% Ni-Cd Battery Bank For 2 X 100% For Parallel Redundant Ups, 230V, 10Kva Rating, Battery Bank Shall Be Suitable For Low Discharge Type, Battery Bank Shall Have Back Up Of Total 4 Hours And Accessories Complete In All Respect. Battery Capacity Should Not Be Less Than 70Kvah (Where Kvah=Battery Cell Ah X 1.2 X No Of Cell). , Design, Engineering, Manufacturing, Assembly, Testing At Shop, Packing, Supply Of 1 No. Cell Booster To Be Provided At Station As Per Technical Specification , Installation, Site Testing & Commissioning Of Complete Ups System With Ups, Battery Banks, Acdb, Cell Booster Etc. With Related Accessories Required For Completion Of The Project For Site