| 1 | Material and labour for complete removal of existing treatment on walls / roof projections including facia, cornices etc by scrapping with mechanicalsander (having mechanical vacum mechanism) with sanding pad of appropriate grit to make surface clean free from dust, loose paint etc by skilled labour complete all as specified and as directed. |
| 2 | Material and labour for prepration of new plastered surface and applying two coat ofacrylic Smooth exterior paint of required shade (Camouflage or light shade) applied @ 1.67 lts/sqm applied over and including priming coat of exterior primer applied @ 2.20kg/sqm over and including one coat of wall care putty(1-1.5 mm thick) as per manufacturer\"s instructions complete all as specified and as directed.Note :- The work shall beexecuted upto 8-9 m hight. The contract has to make all arrangement for execution of work in their quoted rates. |
| 3 | Material and labour for prepration of old plastered surface and applying two coat ofacrylic Smooth exterior paint of required shade (Camouflage or light shade) applied @ 1.67 lts/sqm applied over and including a priming coat of exterior primer applied @ 2.20 kg/sqm over and including one coat of wall care putty (1-1.5 mm thick) as per manufacturer\"s instructions complete all as specified and as directed.Note :- The work shall beexecuted upto 8-9 m hight. The contract has to make all arrangement for execution of work in their quoted rates. |
| 4 | Material and labour for preparation of plastered surface of walls and applyingone coat (1 mm to1.5 mm thick) wall care putty to achieve smooth surface complete all as specified and as diectedNote :- The work shall beexecuted upto 8-9 m hight. The contract has to make all arrangement for execution of work in their quoted rates. |
| 5 | Material and labour for prepration new or old plastred surface of walls and applying one or morecoast of 100% premier acrylic emulsion paint having VOC less than 50 gm/liter and UV resistant as per IS 15489:2004,alkali & fungal resistant,dirt resistant exterior paint of required shade ( Company Depot Tinted) with silicon additive @ 1.43 liter/10sqm over and including primer coat of exterior primer applied @ 0.90 litre/10 Sqm complete all as specified and directed.Note :- (i)The work shall beexecuted upto 8-9 m hight. The contract has to make all arrangement for execution of work in their quoted rates.(ii)The primer and emulsion shall be applied using air less spray machine (by mechanical means). |
| 6 | Material and labour for prepration new or old plastred surface of walls and applying one or morecoat of distemper with Ist quailty acrylic distemper ( ready mixed) having VOC less than 50 gm/liter of approvedmanufacturer\"s specifications of required shade and colour complete all as specified and as directed.Note :- (i)The work shall beexecuted upto 8-9 m hight. The contract has to make all arrangement for execution of work in their quoted rates.(ii)The.distemper with Ist quailty acrylic distemper shall be applied using air less spray machine (by mechanical means) |
| 7 | Note for Ser item No 1 to 6: The work for periodical services shall include the following and the rates quoted by the bidders shall include the same: (a) The work pertaining to periodical services shall be executed by the contractor as per MoU from authorised applicator through manufacturer of the materials like Exterior Emulsion Paint, Putty etc after approval by the GE/AGE (b) The Contractor shall upload with the documents under cover I \"Memoradum of understanding\" (MOU) as per formate givn in Annexure \"A\" after Schedule \"A\" Notes with at least one of the manufaturers mentioned in the contract, failing which the bid shall be laible to be rejected. (c) Use of Scaffolding, tresles ladders, cradles etc necessary for execution of work and protective measures. (d) Removing of nails, making good holes crackes etc. (e) Work in patches and in narrow/ widths, bands, cornices, pilasters etc and cutting in edge of line where necessary. (f) Spreading and removing covering to doors, windows, floors, fittings etc to protect them from splashes. (g) Washing floors, cleaning glass, joinery, elecric fittings, wiring etc. Drops and splashes of paint to be cleaned to the entire satifaction of Engineer-in-Charge. (h) Sample patch of 10 Sqm be prepared considering all the items of periodical and shall be got approved from AGE prior to carrying out further work. |
| 8 | Demolition of brick work including all quoins, arches,pillar etc built in cement mortar complete allcomplete all as specified and directed. |
| 9 | Material and labour for brick work using sub class \"B\"bricks straight or curved on plan exc. 6 m mean radius built in cement mortar 1:6complete all as specified and as directed. |
| 10 | Material and labour for rendering 15 mm thick on fair faces of brick work or concrete surface in cemet mortar 1:4 finished even and fair complete all as specified and directed. |
| 11 | Taking down cement plaster on brick walls or concrete surface including racking out joints,hacking for key ,scrubbing down with water etc and removing rubbish complete all as specified and as directed. |
| 12 | Material and labour for rendering 15 mm thick on fair faces of brick work or concrete surface in cemet mortar 1:6 finished even and fair complete all as specified and directed. |
| 13 | Material and labour for rendering 15 mm thick on fair faces of brick work or concrete surface in cemet mortar 1:4 finished even and fair complete all as specified and directed. |
| 14 | Material and labour for rendering 5 mm thick on fair faces of brick work or concrete surface as in ceiling in cemet mortar 1:3 finished even and fair complete all as specified and as directed. |
| 15 | Material and labourfor prepration of new plastered surace of ceiling and and applying two coats ofwhite washcomplete all as specified and as directed.Note :- The work shall beexecuted upto 8-9 m hight. The contract has to make all arrangement for execution of work in their quoted rates. |
| 16 | Material and labourfor prepration of old plastered surace of ceiling and and applying two coats ofwhite washcomplete all as specified and as directed.Note :- The work shall beexecuted upto 8-9 m hight. The contract has to make all arrangement for execution of work in their quoted rates. |
| 17 | Material and labourfor prepration of old plastered surface of walls and applying one coat of cement based paintcomplete all as specified and directed. |
| 18 | Material and labour for preparation of old steelsurfaces of any description exceeding10 cm width or girth not otherwise described andapplying one coat of synthetic enamel paint complete all as specified and directed. |