| 1 | Dismantling of existing B.T. Surface (flexible Pavement) to a depth of 50 mm.by cold milling with Writgen or similar type machine including loading of dismantled material by automatic conveyor belt to transport vehicle at site excluding lead charges |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 3 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Vibratory roller. to the required density. By Mechanical Means - Grading I(Using Screening-GradingI(Using Screening Type B (11.20 mm) Aggregate) |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Vibratory roller. to the required density. By Mechanical Means - Grading II(Using Screening Type B (11.2 mm) Aggregate) |
| 6 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. |
| 7 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 8 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. |
| 9 | Providing and constructing 75 mm. thick ModifiedPenetraction Macadam (MPM)road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30%crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying thebitumen of VG-30 grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of VG 10 grade bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. ( For Repair works only) |
| 10 | Providing and constructing 75 mm. thick ModifiedPenetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubbleobtained by blasting) heating and spraying thebitumen of VG-30 grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete.Including picking of existing WBM surface. (VG-30 bulk rates are considered to arrive at rates) |
| 11 | Providing and constructing 50 mm. thickModifiedPenetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 30%crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of spcified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat at the rate of 0.30 Kg Sqm.(on existing bitumen surface) (VG-30 bulk bitumen raes are considered to arrive at rates) |
| 12 | Providing and applying tack coat on the prepared surface heating by flames in Boiler and spraying bitumen with sprayer on Concrete surface treated with primer @ 3.25 kg/10 sqm with (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 13 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( over BT Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) |
| 14 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials & bitumen of VG-30 gradepreparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. |
| 15 | Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc., having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. |
| 16 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.146 Dt.04 June 2021. States that the royalty charges ofRs.211.95/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor.E DSR ITEM NO. ... & PAGE NO.... |
| 17 | FOR OTHER MINIRAL |
| 18 | FOR LAB TESTING FOR BITUMENS EXTRACTION TEST(BITUM MIX) |
| 19 | ADD 18% G.S.T. |
| 20 | ADD 1% LABOUR INSURANCE |