| 1 | 1.Providing BT Patches and Pot Holes repairs to the road from Vedapatty to Jothampatti Road(R 90) |
| 2 | Clearing the Light jungle including all labour charges for burying and burning etc.,complete. |
| 3 | Km0/0 -2/6 |
| 4 | Applying Tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. |
| 5 | Km0/0 -1/0 |
| 6 | Km1/0 -2/0 |
| 7 | Km2/0 -2/6 |
| 8 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 9 | Km0/0 -1/0 |
| 10 | Km1/0 -2/0 |
| 11 | Km2/0 -2/6 |
| 12 | Provision for Existing CD Work Painting Charges |
| 13 | Provision for Scheme Name board Charges |
| 14 | 2.Providing Pot Holes repairs to the road from Salarapatti to Amaravathi Sugarmill BT Road km 0/0-0/4(R 141) |
| 15 | Clearing the Light jungle including all labour charges for burying and burning etc.,complete. |
| 16 | Km0/0 -0/4 |
| 17 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 50mm using 45mm IRC size HBG metal Including all Conveyance and Labour charges |
| 18 | Km0/0 -0/4 |
| 19 | Applying Tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. |
| 20 | Km0/0 -0/4 |
| 21 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 22 | Km0/0 -0/4 |
| 23 | 3.Providing BT Patches and Pot Holes repairs to the road from Karuppusamypudur pirivu to North Banglore Thungavi BT road Km 0/0-1/4(R 192) |
| 24 | Clearing the Light jungle including all labour charges for burying and burning etc.,complete. |
| 25 | Km0/0 -1/4 |
| 26 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 50mm using 45mm IRC size HBG metal Including all Conveyance and Labour charges |
| 27 | Km0/0 -1/0 |
| 28 | Km1/0 -1/4 |
| 29 | Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m |
| 30 | Km0/0 -1/4 |
| 31 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. ll other incidental charges etc., complete |
| 32 | Km0/0 -1/4 |
| 33 | Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 34 | Km0/0 -1/4 |
| 35 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 36 | Km0/0 -1/4 |
| 37 | Applying Tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. |
| 38 | Km0/0 -1/0 |
| 39 | Km1/0 -1/4 |
| 40 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 41 | Km0/0 -1/0 |
| 42 | Km1/0 -1/4 |
| 43 | Provision for Scheme Name board Charges |
| 44 | 4.Providing BT Patches and Pot Holes repairs to the road from Panathampatti Dasarpatti road to Pollachi Dharapuram road km 0/0-0/7(R 45) |
| 45 | Clearing the Light jungle including all labour charges for burying and burning etc.,complete. |
| 46 | Km0/0 -0/70 |
| 47 | Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m |
| 48 | Km0/0 -0/70 |
| 49 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. ll other incidental charges etc., complete |
| 50 | Km0/0 -0/70 |
| 51 | Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 52 | Km0/0 -0/70 |
| 53 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 54 | Km0/0 -0/70 |
| 55 | Applying Tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. |
| 56 | Km0/0 -0/70 |
| 57 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 58 | Km0/0 -0/70 |
| 59 | Provision for Scheme Name board Charges |
| 60 | 5.Providing BT Patches and Pot Holes repairs to the road from Mullangivalasu Nattukalpalayam road (via) Karungali Valasu km 0/8-3/6 (R 201) |
| 61 | Clearing the Light jungle including all labour charges for burying and burning etc.,complete. |
| 62 | Km0/0 -2/8 |
| 63 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 50mm using 45mm IRC size HBG metal Including all Conveyance and Labour charges |
| 64 | Km0/0 -2/8 |
| 65 | Picking 5 cm to 10 cm old BT surface and sectioning - 1 sq.m |
| 66 | Km0/0 -2/8 |
| 67 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. ll other incidental charges etc., complete |
| 68 | Km0/0 -2/8 |
| 69 | Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 70 | Km0/0 -2/8 |
| 71 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 72 | Km0/0 -2/8 |
| 73 | Applying Tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. |
| 74 | Km0/0 -2/8 |
| 75 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 76 | Km0/0 -2/8 |
| 77 | Provision for Scheme Name board Charges |
| 78 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |