| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . |
| 2 | Excavationforcatch/side watergutterinallsortsofsoilsto thespecifiedsectionincluding stackingthe excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 3 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50m,notless than97%ofstandardProctordensityafterlaying them inlayersof20cm.to 30cm.withPower roller. |
| 4 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the roadsidebreakingthemtorequiredgradationincludingconveyingtheboulders/Rubbleandstackingthe broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)a)80 mm Metal, By breaking Boulders(Hand broken). |
| 5 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the roadsidebreakingthemtorequiredgradationincludingconveyingtheboulders/Rubbleandstackingthe broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary thedateofapprovalwillformpartofthemeasurements) a)40mmMetal,BybreakingBoulders (Hand broken). |
| 6 | Supplying soft murum at the road site, including conveying and stacking complete. |
| 7 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. |
| 8 | Spreading 80/40mmmetalforroadworkincludingsectionongetccompleteasdirectedbyEngineerincharge . |
| 9 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete |
| 10 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. |
| 11 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. |
| 12 | Compactingthehardmurumsidewidthsincludinglayinginlayersoneachsidewithvibratoryrollerincluding artificial watering etc. complete. |
| 13 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. |
| 14 | Providing and constructing 50 mm. thick ModifiedPenetration Macadam (MPM)road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal+ 70% Hand broken (by breaking rubbleobtained by blasting) heating and spraying thebitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting withstatic roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506etc. complete.Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) |
| 15 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen setfooted in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) |
| 16 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mmaggregatespremixedwithbituminousbindertransportedtositewithVTS,laidoverapreviously preparedsurface,finishedtotherequiredgrade,level,alignment,androllingtoachievethedesired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates areconsidered to arrive at rates) |
| 17 | Providing and laying of Type - B premix seal coat with HMP of appropratecrushed stone chipping 6.70 mm size and penetration bitumen of specified grade @ 0.68 Kg / Sqm. , preparing existing road surface including mixing in suitable Batch Mixplant and rolling bystatic roller having weight 8 to 10 MT. etc. complete. (VG- 30 bulk bitumen rates are considered to arrive at rates) |
| 18 | Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc\", having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm)thickmildsteelsheetpaintedwithonecoatofZincchromatestovingprimerandtwocoatsof enamelpaintonfrontside andgreystove enamelonbackside andborder/messages/symbolsetc.with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross bracedM.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.andfixingtheboardsin1:4:8concreteblockofsize60cmx60cmx75cmincluding,excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge |
| 19 | Add For Royalty Of Other material |
| 20 | WA,IV/CV,SP Gr |
| 21 | SA |
| 22 | FI |
| 23 | WA,IV/CV,SP Gr |
| 24 | SA |
| 25 | FI |
| 26 | PL & LL |
| 27 | SA |
| 28 | Pnr,Soft Pnt,FF Pnt, Sp G. |
| 29 | Extraction |