| 1 | Establishing the Bench Mark with latitude and longitude by DGPS keeping instrument stand still for a period (minimum 6 Hr) to give coordinate accurate to 1m X 1 m and level accuracy 10 mm (plus or minusis achieved) |
| 2 | Hire charges of DGPS instrument with operator and staff for bench mark shifting, topography survey, command area survey, canal survey, dam survey etc. and collection of data, plotting the details and preparing digital map of area in layers, and developing contours where ever required as directed by engineer in charge;including supply of detailed drawings in appropriate scalein soft copy & three sets of Hard copy complete in all respect. These rates are including all types of taxes applicable. |
| 3 | Transfer of bench mark either by DGPS or using auto level (double levelling) by recording levels at 30 meter interval and marking temporary bench mark at suiatble location. For DGPS survey raw data file and for auto level survey, level book along with value of bench mark, locationand plotting of the survey data is to be submitted to the department.In Plain Area |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in hard/dense soil |
| 5 | Distance stone well dressed of required shape and size 60cmx23cmx7 cm with exposed faces chiesel dressed. |
| 6 | Fixing of Distance stone in 30x30x30 cm pit excavated in all type of strata and back filling with cement concrete(1:4:8) projected 10cm above ground level well finished and properly cured.(Excluding cost of Distance stone) |
| 7 | Construction of Pucca bench mark, muttam of size 30x30x75 cm in cement concrete (1:3:6) with maximum aggregate size of 40 mm with 75 cm long MS angle , size 25x25x5 mm embedded including curing transportation and fixing at site etc. complete with all leads & lifts. |
| 8 | Preparation and submissition of detailed Catchment Area Treatment (CAT) Plan in accordance of forest (conservation), Act, 1980 for getting Forest Clearance as per Norms of Forest Dept./ Water Resources Dept / Water Shed Dept.For Major/Medium Irrigation Project. The Treatment plan shall be made for free Catchment Area (excluding the area alread treated / treatment plan prepared by Water Shed or any other Government agency) and accordingly payment shall be made.All the geo referenced Maps/ .shap/.kmz files of free catchment area prepared from GT sheet/ Google/ DTM freely available and related documents shall also be provided in soft/digital form to the dept. Correction/updation shall be made by agency as and when desired by Forest Dept. / Engineer-in-Charge Note- The 60 %payment shall be relesedafter submission of CAT plan and rest 40% shall be released after approval / vetted bycompetant authority. |
| 9 | Measurement of Kucha Houses for compensation estimate purpose, Complete etc like plinth area measurement of house/actual measurement of wood work, bara courtyard plot area etc Complete including preparation of drawing of each individual House in soft and hard copy, superimposing house drawing on village map and prepare individual estimate for compensation purpose and prepare detials of section (4) of land acquisition act in 6 hard copies and master copy. |
| 10 | Mesurement of Puccha Houses for compensation purpose including checking of foundation, etc Complete and to prepare estimate including preparation of drawing of each individual House in soft and hard copy, superimposing house drawing on village map and prepare individual estimate for compensation purpose & prepare details of section (4) of land compensation act in 6 hard copies and Master copy. |
| 11 | Measurement of Bara/Chowk including preparation of Drawing of each individual Bara/Chowk in soft copy and hard copy, superimposing Bara/Chowk drawing on village map, etc Complete and prepare individual estimate for compensation purpose & prepare details of section (4) of land acquistion act in 6 hard copies and master copy. |
| 12 | Measurement of well and attached accessories including marking of well, etc Complete, identification from revenue record and local enquiry including preparation of drawing of each individual well in soft and hard copy, superimposing well drawing on village map and prepare individual estimate for compensation purpose & prepare details of section (4) of land acquisition act in 6 hard copies and master copy |
| 13 | Preparation of list of population for affected/dispalced persons as per gender as male, female and as per age group above & below 18 year as per direction of engineer in charge along with listing the affected/displaced families as per house no. by their name and collect all the like Aadharcard, Voter Id, Rashan Card, Bhamashh card or any other documents, date of birth, age, No. of each document mention in list including collection of the information of Pashubara, petty shop, etc complete as per house number. |