}

Tender For Restoration Work Of Damaged Structure Of Syphon, V.R.B, Kulaba, Pitching And Banks Etc. Of Dy. Nuh System. - Surface Dewatering Of Foundation Including All Arrangement In Kwh By Diesel Pump Set. 2 Dismantling Brick Work Or Stone Work And Cem, firozabad-Uttar Pradesh

Tender Notice

51857451
Tender For Restoration Work Of Damaged Structure Of Syphon, V.R.B, Kulaba, Pitching And Banks Etc. Of Dy. Nuh System. - Surface Dewatering Of Foundation Including All Arrangement In Kwh By Diesel Pump Set. 2 Dismantling Brick Work Or Stone Work And Cem
Tender
Indian
Uttar Pradesh
Firozabad
27-10-2025

Tender Details

Tender For Restoration Work Of Damaged Structure Of Syphon, V.R.B, Kulaba, Pitching And Banks Etc. Of Dy. Nuh System.- Surface dewatering of foundation including all arrangement in kwh by diesel pump set. 2 Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge 3 Earth work in embankment by power transported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. 4 Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including all lift & lead as directed by Engineer- in-Charge. 5 Earthworkin foundation in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in chargeupto distance of 30m from thefoundation trenches for other structure. 6 Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer- in-Charge. 7 Earthwork in removing bundha diversion including disposal of removed earth as per directed by engineer in charge incluing lift of 1.5m and lead upto 30m with all cost of labour material T&P etc complete. 8 Providing concrete for plain concrete M 10grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20-40 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete, including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 9 Providing concrete for plain or Reinforced cement concrete M 15grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 10 Providing concrete for Reinforced cement concrete M20grade in foundations including cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 11 ProvidingReinforced cement concreteM25design mix grade in foundations including cost of finishing and excluding reinforcement in 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. 12 Providing plain/reinforced concrete M 25 gradein wearing coat etc using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing complete as per drawings and technical specifications ,including overhead charges & Contractors profit but excluding GST. 13 Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour, t & p,material etc. Complete 14 Centering shuttering in special type of RCC work such as curves,T-beams,Bridges and syphons etcincluding line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc complete 15 Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST. 10,12,16,20 mm dia bar 16 Brick work in 1:4cement mortar up to 3M lift & 60 M lead of materials. Including cost of labour,material,T&P etc complete 17 Pointing or Plastering in 1:3 cement mortar on brick masonry including all cost of labour,material T&P etc complete. 18 Distempering Ist coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials 19 Finishing walls with putty and(Two coats) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr/10sqm curing, cost of all materials, labours, T&P etc. required for proper completion of the work. 20 Supplying,Fixing and installation ofMS steel gate for head regulation of minor and dy. With all cost of transporation,labour machines material complete 21 Uprooting jhunds and moonj with proper disposal away from site etc Complete. 22 Leveling and dressing service road including earth work for petty repairs. 23 Laying of brick kharanja road including all cost of material ,labour , machine , contractor profit , transportation of material etc complete. 24 Supplying and laying local sand in narrow sectionwith lead upto 30M and lift upto 1.50 M.with ramming and dressing including all cost of material and labour, T&P etc complete of work. 25 S/L BoulderIncluding cost of all labour and T&P etc. Complete. 26 Filling empty cement bag wiith earth or silt sewing placing in position upto 60m lead. 27 Supplying,Laying oulet pipe of dia100mm-150mm in proper line level and alignment with all cost of labour,etc complete. 28 Supplying Laying Hume pipes of NP3 internal dia 1000-1400 mm dia grade in canal including all cost of material,Transportation ,line levelling preparing surface, sealing joints complete. 29 Pre-moulded Joint filler, 25 mm thick for expansion joint in syphon barrel with water stopper sealing including all cost of material T&P etc complete.

Key Value

Document Fees
INR 8516 /-
EMD
INR 1515000.0 /-
Tender Value
INR 7.57 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail