Tender For Rising Main Pillar Girder Work And Rebore Of Tubewell In Water Supply Scheme - Work Of Boring/Pillar And Rising Main Of Tube Well For Drinking Water Arrangement In Jalkal Premises In Ward No. 09 Shastri Nagar With 18% Gst - Excavation of the earth work for foundation in mix soil including left up 1.50m. and lead up to 50m. filling watering, ramming of excavated earth in to the trenches or in the space between the building and side at foundation trenches and disposal of surplus earth up to distance 50 m. from the centre of the foundation. Tranch at the Pathana water supply scheme. 2 Concrete with 40mm gauge brick ballast fine sand and cement in proportion of 12:6:1 in foundation.including supply of all materials labour T&P etc. complete. 3 First class brick work in 1:4 cement and coarse sand morter in foundation and plinth including supply of all materials labour T&P etc. complete. 4 Mill steel reinforcement for R.C.C. work wrought to required shape as necessary including bending. Cuting etc complete. including supply of all materials labour T&P etc. complete. 5 R.C.C. work with cement, coarse sand and 20mm gauge aproved stone ballast in proportion of 1:1.5:3 in pillar including supply of all materials labour T&P etc. complete. 6 First class brick work in 1:4 cement and coarse sand morter in uper structure including supply of all materials labour T&P etc complete 7 supply of 3.6 m rs joist (200mmx100x100mm) including carting 8 Supply of MS nut bolt (5x4) for fixing of riging main CI pipe. 9 Erection and fixing of R.S. Joist size 100mm on the top of pillar including of all abour T&P etc. complete. 10 12mm thick plaster with cement and coarse sand mortor in 1:4 over brick work minimum thick ness not to be less then 10mm including supply of all material, labour T&P etc. complete. 11 Finishing wall with snowcem penting three coat over including supply of all materials labour T&P etc. complete. 12 Dismentaling of old risingmain pipe 150mm C.I.D.F. Pipe and fiting etc including supply of all labour T&P etc. complete.. 13 construction of bypass chamber with 10 m drain including supply of all labour materials t&p etc complete as per departmental drawing 14 Supply of the following sizes of DI K-Pipe pipes conforming to latest/relevant I.S. specification completion in all respect F.O.R. destination including all taxes and insurance etc, TW to O.H.T 150MM, 15 by pass 150mm 16 Supply of the following CIS/S or D.F. special confirming to latest/ relevant I.S. specification suitable for above DI K-9 Pipe pipes F.O.R. destination including all taxes and insurance etc. 10% of item no 01 17 Supply of the following sizes of C.I.D./F sluice valves class- 1 working pressure 10 kg./cm2 conforming to IS: 780/1969 or its latest amendments F.O.R. destination including all taxes and insurance etc150mm 18 Excavation of earth in ordinary soil (loam, clay or sand) for pipe line trenches including lift up to 1.5 m and lead up to 50 m and refilling, watering, ramming of the excavated earth into the trenches and also disposal of surplus earth up to 50m from the trongb,TW to O.H.T 150MM 19 by pass 150mm 20 Carting from the store (up to 8km) the following sizes of D.I.K.-9 pipes and specials to the sites of work lowering them into trenches and laying true to alignment and gradient including jointing, testing of pipe line and including the supply of jointing materiale, TW to O.H.T 150MM, 21 by pass 150mm 22 Carting of C.I.D./F sluice valves of following sizes from store to the site of works, lowering them into already prepared trenches and fixing them in position including supply of jointing materials such as bolt nut, rubber ine action white lead ate coquicad, 150mm 23 Provide all materials, labour, T&P etc.required for proper completion of work and construct Laying of 80 mm thick CC pre rubber moulded interlocking paver tile s including 30 mm thick fine sand bed over (280mm thick compacted base of two layer of GSB & WMM and also including earth work in excavation in proper slope & camber with 100 mm thick Concrete with 40 mm gauge brick ballast, local sand and cement in proportion of (12:6:1) in foundations for water works 24 Design and construct Thrust Block made in R.C.C. with cement coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3 for pipe line including supply of MS reinforcement wrought to required shape as necessary its bending fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials labour T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in-charge. 25 Supply of MS reinforcement wrought to required shape as necessary its bending, fixing & binding the same 26 Supply of all materials, labour, T&P 2 etc required and construction masonry typed sluice value chamberas per departmental type & desian 27 TRANSPORTATIONRIG MACHINETransportation of rig machine including Loading, unloading, Erection, Dismantling & labour etc complete in all respect. 28 AIR COMPRESSORTransportation of 300 psi compressor including Loading, unloading, Erection, Dismantling & labour etc complete in all respect. 29 O.P. UNITTransportation of 2 cusec op unit including Loading, unloading, Erection, Dismantling & labour etc complete in all respect 30 CONSTRUCTION OF TUBE WELL (DRILLING) As per IS 2800 (Part I & II)Drilling of BORELogging of Bore 31 Drilling of 600mm dia bore from G.L. to 65m BGL. 32 Drilling of 450mm dia bore from 66m BGL to 100m BGL. 33 Drilling of 450mm dia bore from 101m BGL to 200m BGL 34 LOWERING OF TUBE WELL ASSEMBLY AND SHROUDING OF T.W. BY GRAVEL-Lowering of 300mm X 150mm dia tube well assembly in bore hole and shrouding of pea gravel between annular space of bore hole and T.W. assembly from G.L. to 180m BGL.Lowering of 300mm dia MSERW 7.1mm thick plain pipe from GL to 60m BGL. 35 Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 61m BGL to 100m BGL 36 Lowering of 150mm dia MSERW plain/slotted pipe 7.1mm thick from 101m BGL to 180 m BGL. 37 MATERIALSTUBE WELL: ASSEMBLY (As per IS 4270, IS 8110)300mm dia size MSERW housing pipe 7.1mm thick including with 1 no 300 X 150mm dia M.S reducer 16mm thick, 1 no M.S. well cap 12mm thick, M.S. ring 12mm thick, M.S. S/I clamp, T.W. Support (I Section) etc comp in all respect 38 150mm dia MSERW 7.1mm thick plain/slotted pipe including with M.S-ring 12mm thick, 1 no M.S. bail plug, center guide etc comp in all respect. 39 PEA-GRAVEL (As per IS 4097)1.60mm to 4.80mm size pea-gravel of Lalkuwan quarry duly screened, washed and proper stacking at site. 40 DEVELOPMENT OF TUBE WELL Development of tube well by 300 PSI air compressor 41 Development of tube well by 2 cusec O.P. Unit. 42 Welding of Tube well cover by Electric welding 43 TEST Chemical and bacteriological test. 44 sitc of required cable 45 main piping and valves SITC of 150mm dia size main piping and valves with 36mtr column pipe, power wiring, earthing, painting, tool set, wiring of pump house, chain pulley block complete in all respect with all required material, T& P labour.