Tender for supply of equipment/ Material, design, erection, testing & commissioning for SOP to LIS of Jal Shakti Vibhag near Nagni Mata Temple by prov. 11/0.4 KV 250 KVA s/stn a/w 11KV HT & LT Linein (E) section Bhadwar under ESD Nurpur(T.S No.56/2025-26)-11 KV HT Line 2 Prov. ACSR6/1/3.35mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage}. 3 Prov. Steel Tubular Poles (10m, Working Load > 200 kgf/m²). . 4 Prov. Muffs with concerete filling. 5 Prov. Disc Insulator Set cleave & Tounge halicaly formed fitting 6 Prov. Pin Insulator with GI Pin 7 Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length: 2340 mm 8 Prov. X-Bracing Set MS Angle Iron 50X50x6, Length: 2125 mm x 2 No 9 Prov. Angle Iron (50x50x6 mm), Length: 2800 mm for GO Swtich 10 Prov.HT Stay set complete . 11 Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) 12 Prov. GO AB Switch Unit (11kV, 400A,)O/D type 13 Prov. Danger Plate (250X200X1.6 mm) 14 Prov. 11Kv DO Fuse complete in all respect. 15 .Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 16 Prov. Barbed Wire 17 Prov. Aluminium Paint 18 Erection of 10 Mtr. ST pole singlestructure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect. 19 Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning 20 Erection of G.O. switch 400 Amp. Comp. 21 Fixing of jumper 22 Sagging of conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). 23 Transportation charges @10490- per Km 24 Mannual carriage of material 1 KM HT line considering average distance from road to site of work 25 250 KVA Transformer 26 Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVA . 27 Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) . 28 Prov. Muffs with concerete filling 29 Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line 30 Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LAs 31 Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch 32 Prov. Transformer Bed, Belting & Knee Bracing 33 Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed 34 Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] 35 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 36 Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos 37 Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing 38 Prov. Transformer LT Distribution Box and GO Switch fixing Assembly 39 Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 40 Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos 41 Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm 42 Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type 43 Prov. D.O Fuse Unit 44 Prov. Lighting Arrester, 9 kV Station Class(Porcelain Type) 45 Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) 46 Prov. Stay set complete 47 Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) 48 Prov. Pipe Earthing Set 49 Prov. LT Distribution Panel Box With ACB/MCCB 400 Amp Capacity for 250 KVA T/F 50 Prov. Half Clamp (M.S. Flat 50X6 mm) 51 Prov. Full Clamps (M.S. Flat 50X6 mm) 52 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 53 Prov. Aluminium Thimble 54 Prov. CopperThimble 200 Amp 55 Prov. Danger Plate 56 Prov. Barbed Wire 57 Prov. Half Clamp (M.S. Flat 50X6 mm) 58 Prov. Half Clamp (M.S. Flat 50X6 mm) 59 Prov. LT Cable (3.5 Core) 400 mm² 60 Prov. Energy Meter DLMS complaint 300/5A CT Type for 250 KVA Transformer 61 Prov. Aluminum Paint. 62 Prov. 6/1/3.35, 50mm². 63 Prov. Plinth for 250KVA Transformer and Fancing Work Complete in all respect. 64 Prov. CT/PT Combined Unit 200/100/5Amp. Complete in all respect. 65 Prov. LT Swtiched Capactior 36-KVAr for 250KVA(rate per KVAr) 66 Erection of 250 KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earthdrilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect. 67 Transportation charges @10490/- 68 Prov. Transportation charges & Mannual carriage of 250 KVA pole mounted distribution S/Stn. (line length 0.500Km) 69 LT Line 70 Prov. AAAC (7/3.15 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage}. 71 Prov. G.I WireNo. 8 SWG 72 Prov. Steel Tubular Poles (8 m, Working Load > 200 kgf/m²). . 73 Prov. Muffs with concerete filling. 74 Prov. Shackle Insulator with D-Iron 75 Prov. LT Stay Set I/c Egg Insulator. 76 Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] 77 Prov. Stay Wire 78 Erection of 8 Mtr. ST pole singlestructure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect. 79 Erection of Stay set LT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning 80 Sagging of conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). 81 Transportation charges @10490/- 82 Mannual carriage of material 1 KM LT line considering average distance from road to site of work 83 Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.