| 1 | Notes:1.All work should be done without damaging lawn and laboratory equipment. Use sheet for placing of material in lawn and for covering of equment in chemistry laboratory.2. No Debris shall be left over during the work.3. The contractor has to be clean the site after the complertion of work and handover as satisfection of Engineer-in-Charge.4. Before quoting, the Bidder shall visit the site and make himself familiar with the site nature, conditions and Quantum/ scope of work involved. Site inspection and uploading of report is mandatory. The bidder shall upload the site inspection report duly signed by departmental representative and Bidder. Without the site inspection report, the bid will be summarily rejected.5. The rates quoted shall include cost of all materials, labour, ladders, transportation, hoisting, tools, tackles and installation including all taxes (except EPF and ESI) and other charges if any. No extra payment over and above the rate quoted shall be made to the contractor in this respect.6. The Workers employed for the work still strictly follow all safety measures as stated in safety code of this tender and also as per DAE safety code.7. The contractor shall adhere to the provisions of applicable labour laws such as Contract Labour (Regulation and Abolition) Act,1970. Minimum Wages Act, 1948, Employee State Insurance Act. Equal Remuneration Act, 1970 and rules made there under.8. Contractor has to pay minimum wages, EPF and ESI to the manpower deployed for the work as per state/ Central Government orders issued from time to time. The actual amount paid towards EPF and ESI shall be reimbursed to him by the department after satisfying that it has been actually and genuinely paid by the contractor The Bidder should not consider EPF and ESI in his rates. |
| 2 | Earth work excavation and refilling in trenches or drains, foundation in all kinds of soils, other than hard and soft rock not exceeding 1.5m in depth including consolidating the foundation bed, dewatering, shoring etc., and disposing offthe surplus earth within a lead of 150m complete with cost of labour, tools & plants all as per specifications and directions of Engineer-in-Charge. |
| 3 | Carefully removing of Korean carpet Green Grass in lawn and same be planted after completion of work and Use HDPE sheetsfor placing of earthto avoid damaging of lawn. Cost of heavy duty plastic sheets 105 sqm is included in this item. |
| 4 | Plain cement concreteusing 20mm size stone aggregate at all floors and locations (upto a height of 25m )including cost of mixing, consolidating, curing and finishing the top surface etc., complete with cost of materials, labour, tools & plants all as per specifications and directions of Engineer-in-ChargeP C C 1:3:6 (1cement: 3sand: 6 aggregate)using 20mm size stone aggregate at all levels. |
| 5 | Reinforced cement concrete 1:1.5:3/M20 (1cement: 1.5 sand: 3 aggregate 20mm size) for lintels, beams, shelves, slabs. columns, footings, sun shades etc. at all locations including cost of mixing, consolidating, curing and finishing the top surface etc.( but excluding the cost of centring & shuttering ) complete with cost of materials, labour, tools & plants all as per specifications and directions of Engineer-in-Charge at all levels |
| 6 | Providing, fabricating and fixing reinforcement with high yield strength deformed bars or TMT bars of all dia., grade Fe500D or more conforming to I.S. 1786 for reinforced concrete works at all levels, floors and heightsincluding supplying, cutting, bending, fixing, and tying in position with 18 gauge soft drawn annealed binding wire etc., all complete with cost of materials, labour, tools & plants, scaffolding all as per specifications and directions of Engineer-in-charge. (Binding wire shall not be measured for payment.) |
| 7 | Providing form work, Centring and shuttering using Plywood board,steel plates, planks including strutting and propping etc. at all floors and removal of the same for in situ reinforced concrete and plain concrete work including close haking of exposed concrete surfaces etc. complete with cost of materials, labour, tools & plants all as per specifications and directions of Engineer-in-Charge |
| 8 | Providing, cutting, laying and fixing of machine cut, mirror polished of17mm/18mm thick granite stone slabs of approved shades such asJet Black or any other approved two or more colours and texture for flooring / wall dados fixing in position at all levels, required size and shape as per pattern approved by Engineer-in-charge for Slab and column for supporting rock samplelaid over 20mm thick base cement mortar 1:4 (using coarse sand) with joints treated with white cement, mixed with matching pigment, epoxy touchups, including rubbing, curing, moulding and polishing the edges to give high gloss finish and using Laticrete for fixing slab side with granite etc. Complete with cost of all materials, labour, tools & plants scaffolding, wastage and final polishing etc., all as per specifications and directions of Engineer-in-charge. |
| 9 | Extra for edge moulding of18mm thick polished granite stone slabs of above shades allfloors and levels including machine polishing to edges of all exposed areas to give high glass finish etc., complete with cost of materials, labour, tools and plants etc., all as per specifications and directions of Engineer-in-charge. |
| 10 | Supply, fabrication, erection and fixing in position M.S. structural steel work made of MS angles, flats, sheets, tees, channels, pipes etc., at all floors and heights including one coat of primer , cost of labour, scaffolding, tools & plants etc.., all complete as per specifications and directions of Engineer-in-Charge. |
| 11 | Transplantation of Areca Palm tree with in a distance of 2km including excavation around existing tree, pruning of branches, lifting, loading and transportation of existing tree, digging pits for placing tree at new place, adding manure, sand, fertilizer, hormones and bio fertilizer to it. Levelled and neatly dressed and disposal of surplus materials from old existing and new sites to designated place. Each tree should be firmly secured to the stake so as to prevent excessive movement, flooding with water, treatment of roots, rope and gunny bags as per direction of officer Incharge. T&P and all required materials shall be arranged by the contractor and nothing extra shall be paid on this account.a) Areca palm tree with multiple stems, total clump considered equivalent to one tree with girth beyond 150cm at 1 m height above ground level as per site condition. |
| 12 | Removing/Scrapping of existing paint upto plastered surface by Mechanically/manually method ensuring a smooth surface including necessary repair to achieve uniform surface. Including for cost of covering existing furniture,equiment,device with plastic sheets and complete cleaning of areasas per directedby Engineer-In-charge. |
| 13 | Providing and applying cement base wall care putty of approved make appropriate to acid proof/resistant paintat all floors and locations, plastered surfaces finished smooth to correct line level, plain, plumb etc., including preparing the surfaces, scaffolding, smoothen the putty surfaces with very fine water proof emery paper to get a glossy finish etc. complete as per specifications, as per manufacturers specifications, drawing & as directed by the Engineer-in-Charge. |
| 14 | Painting one coat of Epoxy primer in laboratoryappropriate to acid proof/resistant paint manufactured by approved makeon internal walls & ceilings and finishing the surface at all levels, floors and locationsincluding preparing the surface byremoving loose paint, sand papering, cleaning and removing the dust, dirt, oil marks, cobwebs etc.,complete with cost of all materials, tools and plants, labour, scaffolding, cleaning floors, etc. all complete as per specifications and directions of Engineer-in-charge. |
| 15 | Painting with acid proof/resistant paint of approved brand and manufacture of required colour to give an even shade: Two coats are mandatory. However, additional coats required wherever necessary to satisfaction of Engineer-in-Charge. |
| 16 | Applying priming one coat with red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works one coat.Including preparing the surface by sand paperingcleaning and removing the dust, dirt, loose painting, grease, oil stains, cobweb, fungus etc. |
| 17 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: one coat or more coats on old work/surface. |