|
| 1 | Comprehensive annual Maintenance contract ofwindow Airconditioners, Split Airconditioners, Cassette Airconditioners, Refrigerators, Watercoolers, etc., by rectification of all kinds of faults including repair/replacement of compressors, fan motors, control boards, relays, PCB, sensors, thermostats, capacitors, OLPs, leak testing, Gas charging, oil charging, etc. for 1 year period to complete as per the scope of work and of following capacities. It also includes 4 quarterly service in a year. |
| 2 | 1.5 TR capacityWindow air-conditioners (running in good condition) |
| 3 | 1.5 TR capacity Hiwall/Casette type Split airconditioners with fixed speed compressors. (running in good condition) |
| 4 | 2.0 TR capacity Hiwall/Casette type Split airconditioners with fixed speed compressors. (running in good condition) |
| 5 | 1.5 TR capacity Hiwall/Casette type Split airconditioners with inverter type variable speed compressors. (running in good condition) |
| 6 | 2.0 TR capacity Hiwall/Casette type Split airconditioners with inverter type variable speed compressors. (running in good condition) |
| 7 | 3.0 TR capacity 3Ph Split Airconditioners (running in good condition). |
| 8 | 4/5.0 TR capacity 3Ph mega ductable/Floor Standing Split Airconditioners. (running in good condition) |
| 9 | 7.5 TR capacity 3Ph mega/ductable Split Airconditioners. (running in good condition) |
| 10 | 20 / 40 liters/hr capacity Watercoolers. (running in good condition) |
| 11 | 165 /286 / 300 liters capacity Refrigerators. (running in good condition) |
| 12 | Tinkering and painting of Air conditioner/Water Cooler/Refrigerator equipment\"s sheet metal parts & its frame by cutting, welding/brazing, scrab/scrach with emery sheet and clean all the rust/ paint on all the MS/GI/Al sheet metal parts and paint with one quote of red oxide primer and one coat of synthetic enamel paint or Duco/metalic paint complete with spray gun/brush as required. |
| 13 | Different makes window Airconditioners of 1.5TR capacity |
| 14 | Different makes Split Airconditioners of 1.5/2 TR capacity. |
| 15 | Different makes 2.5/3.0 TR capacity 3Ph split-airconditioners |
| 16 | Different makes Water Cooler of20 / 40 ltr/hr capacity. |
| 17 | Different makes Refrigerators, 165 /286 / 300 ltrs capacity |
| 18 | Dismantling of 1.5 TR window Airconditioners and shifting to AC workshop near IGCAR Material gate from site locating outside the IGCAR complex (Approx. 5 km distance) by means of tricycle/suitable mode. |
| 19 | Dismantling of 1.5/2/2.5TR Split Airconditioners and shifting to AC workshopnear IGCAR Material gate from site locating outside the IGCAR complex (Approx. 5 km distance) by means of tricycle/suitable mode. |
| 20 | Dismantling of various capacities Water Cooler, Refrigerator & Deep-Freezer and shifting to AC workshop near IGCAR Material gate from site locating outside the IGCAR complex (Approx. 5 km distance) by means of tricycle/suitable mode. |
| 21 | Shifting and Installation of new/old Window Airconditioners/Split Airconditioners/Water Coolers/ Refrigerators/Deep-Freezers and shifting the above AC & Refrigeration units safely by means of tricycle/trolley as per the standard pracce and as specified within the lead distance of 2 km. |
| 22 | Shifting and installation of new/old 1.5 TR window Airconditioners outside the IGCAR complex. |
| 23 | Shifting and installationof new/old 1.5/2/2.5TR Split Airconditioners outside the IGCAR complex. |
| 24 | Shifting and installation of new/old Water Cooler, Refrigerator & Deep-Freezer outside the IGCAR complex. |
| 25 | Carry out operation of Therma Energy Storage system (TESS) installed at IGCAR north plant site andrecording parameters of chillers, Primary, Secondary & load pumps, TES system, AHUs, etc.It also includescleaning of strainers & TES system, flushing of chilled water pipe lines & charging of water in the pipe lines,Air balancing, dismantling, cleaning & refixing of AC grills & diffusers, etc. as per the specification given in the section-V. |
| 26 | Supply and installation of 1.5TR Split type Inverter Air-conditioners with BEE 3 star minimum ISEER value (Wh/Wh) shall be 3.8 and confirming to IS:1391 (Part-2) with latest amendments. Air-conditioners capable of performing; Cooling, Dehumidifying, Air Circulation & Filtering.Note: The inter connecting copper tubes with insulation and power cable of min. 4mtr to be supplied with this AC units. |
| 27 | Supply and installation of 2.0TR Split type Inverter Air-conditioners with BEE 3 star minimum ISEER value (Wh/Wh) shall be 3.8 and confirming to IS:1391 (Part-2) with latest amendments. Air-conditioners capable of performing; Cooling, Dehumidifying, Air Circulation & Filtering.Note: The inter connecting copper tubes with insulation and power cable of min. 4mtr to be supplied with this AC units. |
| 28 | Supply, installation, testing and commissioning of BEE 3 star rated 2.0 TR Cassette type ceiling suspended Inverter Air-conditioners with BEE 3 star minimum ISEER value (Wh/Wh) shall be 3.8 and confirming to IS:1391 (Part-2) with latest amendments suitable for operation on 230 ± 10% volts, 50Hz, 1 phase a.c power supply. Air-conditioner capable of performing; Cooling, Dehumidifying, Air Circulation & Filtering. The unit shall be filled with R-22 or non CFC Refrigerant and comprises of all accessories like, Energy Efficient hermetically sealed Non-inverter compressor, air cooled Condenser and Evaporator coil made of copper tube with aluminium fins, fuzzy logic controller, Filters, Expansion device, blower, fans, liquid & hot gas refrigerant piping, charged with Refrigerant, etc. complete as per specification. |
| 29 | Supply and installation of Hot gas & Liquid line Copper piping alongwith thermal insulation and suitable cabling and 3 core, 2.5 sq. mm, 1100 V multistrand flexible FRLS copper cable to interconnect indoor and outdoor units of 1.5TR& 2TR Split AC as per the specification given in the scope of work. |
| 30 | Supply and installation of 2 mm thick MS power coated outdoor unit mounting stand for 1.5/2.0 TR Split/Cassette/Floor Standing Tower Airconditioners as specified. |
| 31 | Supply and installation of Airconditioner\"s Condenser/Evaporator coil as per original removed/as per the specification given in the scope of work. |
| 32 | Providing & fixing of Washable synthetic Air filter for 1.5TR window Airconditioner as per original removed/as per the specification given in the scope of work. |
| 33 | Providing & fixing of Washable synthetic Air filter for 1.5/2TR Split Airconditioner as per the as per original removed/as per the specification given in the scope of work. |
| 34 | Providing & fixing of500 mm length & 100 mm dia UPVC filter assembly along with 1 m braided hose with suitable inlet & outlet connectors, fixing plate for using Water Coolers as per the specification given in the scope of work.. |
| 35 | Providing & fixing of 10 micron Spun Poly Propline Pre filter ( sediment filter) element of500 mm length, 50 mm OD with minimum flow rate of 3 lpm filtration for using Water Coolers as per the specification given in the scope of work. |
| 36 | Providing & fixing of 500 mm length Activated Carbon filter for having a minimum Iodine value of 900 for adsorption of residualchlorine, removal of odor, and other contaminations for taste improvement of the filtered water for using above Water Cooler filter as per the specification given in the scope of work. |
| 37 | Providing & fixing of chromium coated brass 1/2\" water cooler tap/faucet (push cock type/gravity type) for the above Water Cooler as per the specification given in the scope of work. |
| 38 | Providing & fixing ofchromium coated brass 3/4\"float valve assembly with 100 mm dia float valve for the above Water Cooler as per the specification given in the scope of work. |