E-Tenders For Supply, Installation, Configuration, Testing And Commissioning Of Structured Local Area Network At 2 Secretariat Buildings At Hq And 3 Important Buildings (Raj Bhawan, Haryana Bhawan, New Delhi And State Guest House, Chanakyapuri)
Tender Overview
Project Description
e-Tenders for Supply, Installation, Configuration, Testing and Commissioning of Structured Local Area Network at 2 Secretariat Buildings at HQ and 3 Important Buildings (Raj Bhawan, Haryana Bhawan, New Delhi and State Guest House, Chanakyapuri); 1 CAPEX: Rates for items with 1 year warranty (S# 1 to 37) and installation & commissioning 2 Core Switch 3 Distribution Switch 4 Edge Switch 5 Rack Server for NMS Software With 55 LED Display 6 Computer with 55 Display for NMS Software 7 40G SFP Transceivers (Single Mode) 8 25G SFP Transceivers (Single Mode) 9 6 Core Fiber Cable (Single Mode) 10 24 Port LIU Fully Loaded 11 12 Port LIU Fully Loaded 12 6 Port LIU Fully Loaded 13 Fiber Patch Cord 3M (Single Mode) 14 10G SFP Transceivers MM 15 6 Core Fiber Cable MM 16 24 Port LIU Fully Loaded 17 12 Port LIU Fully Loaded 18 6 Port LIU Fully Loaded 19 SC Type Multi Mode Pigtail 20 Fiber Patch Cord 3M 21 Cat 6 Cable 22 Cat 6 24 Port Fully Loaded Jack Panel 23 Cat 6 I/O Complete Set 24 Cat 6 Patch Cord 1M 25 Cat 6 Patch Cord 3M 26 42U Rack (With Accessories) 27 12U Wall Mount Rack (With Accessories) 28 9U Wall Mount Rack (With Accessories) 29 PVC Duct 45x25 MM 30 PVC Duct 30x25 MM 31 PVC Pipe 2 with Accessories 32 PVC Pipe 1.5” with Accessories 33 PVC Pipe 1” with Accessories 34 HDPE Pipe 2 35 10 KVA Online UPS with lockable casing 36 3 KVA Online UPS lockable casing 37 2 KVA Online UPS lockable casing 38 Power Points with cabling for Racks & Switches from UPS 39 Installation & Commissioning 40 OPEX: Rates for warranty from 2nd Year to 5th Year 41 2nd year warranty for all items (S# 1 to 37) 42 3rd year warranty for all items (S# 1 to 37) 43 4th year warranty for all items (S# 1 to 37) 44 5th year warranty for all items (S# 1 to 37) 45 Manpower: Rates for Resident Engineer for 1st year only 46 Resident Engineer for One year
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 14-Nov-2025 | Corrigendum for bid submission date extension | Date | 02-Dec-2025 |
| 2 | 02-Dec-2025 | Corrigendum 2 for Last Bid Submission date extension | Date | 16-Dec-2025 |
| 3 | 12-Dec-2025 | Corrigendum 3 for Last Bid Submission date extension | Date | 02-Jan-2026 |
| 4 | 31-Dec-2025 | Corrigendum 4 for Last Bid Submission date extension | Date | 16-Jan-2026 |
| 5 | 06-Jan-2026 | Corrigendum 5 | Other | 16-Jan-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | CAPEX: Rates for items with 1 year warranty (S# 1 to 37) and installation & commissioning |
| 2 | Core Switch |
| 3 | Distribution Switch |
| 4 | Edge Switch |
| 5 | Rack Server for NMS Software With 55\" LED Display |
| 6 | Computer with 55\" Display for NMS Software |
| 7 | 40G SFP Transceivers (Single Mode) |
| 8 | 25G SFP Transceivers (Single Mode) |
| 9 | 6 Core Fiber Cable (Single Mode) |
| 10 | 24 Port LIU Fully Loaded |
| 11 | 12 Port LIU Fully Loaded |
| 12 | 6 Port LIU Fully Loaded |
| 13 | Fiber Patch Cord 3M (Single Mode) |
| 14 | 10G SFP Transceivers MM |
| 15 | 6 Core Fiber Cable MM |
| 16 | 24 Port LIU Fully Loaded |
| 17 | 12 Port LIU Fully Loaded |
| 18 | 6 Port LIU Fully Loaded |
| 19 | SC Type Multi Mode Pigtail |
| 20 | Fiber Patch Cord 3M |
| 21 | Cat 6 Cable |
| 22 | Cat 6 24 Port Fully Loaded Jack Panel |
| 23 | Cat 6 I/O Complete Set |
| 24 | Cat 6 Patch Cord 1M |
| 25 | Cat 6 Patch Cord 3M |
| 26 | 42U Rack (With Accessories) |
| 27 | 12U Wall Mount Rack (With Accessories) |
| 28 | 9U Wall Mount Rack (With Accessories) |
| 29 | PVC Duct 45x25 MM |
| 30 | PVC Duct 30x25 MM |
| 31 | PVC Pipe 2\" with Accessories |
| 32 | PVC Pipe 1.5” with Accessories |
| 33 | PVC Pipe 1” with Accessories |
| 34 | HDPE Pipe 2\" |
| 35 | 10 KVA Online UPS with lockable casing |
| 36 | 3 KVA Online UPS lockable casing |
| 37 | 2 KVA Online UPS lockable casing |
| 38 | Power Points with cabling for Racks & Switches from UPS |
| 39 | Installation & Commissioning |
| 40 | OPEX: Rates for warranty from 2nd Year to 5th Year |
| 41 | 2nd year warranty for all items (S# 1 to 37) |
| 42 | 3rd year warranty for all items (S# 1 to 37) |
| 43 | 4th year warranty for all items (S# 1 to 37) |
| 44 | 5th year warranty for all items (S# 1 to 37) |
| 45 | Manpower: Rates for Resident Engineer for 1st year only |
| 46 | Resident Engineer for One year |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender