Tender for Dlt Work At Mohalla Chaawali Near Kabaristan Gursai Tanvi Ward No. 4, Block Gursai, Constituency Mendhar, District Poonch- 1 DRSM works 2 DRSM works: Erection of DRSM Check dams as anti soil erosion measure incl all operations as per Forest Schedule (The rate includes the earth work for foundation, the cost of collection, carriage of stones to the work site, fashioning of stones to be used along the exposed faces in the construction of DRSM) However 15% void shall be deducted after measurement 3 POND Work ( 01 No) 4 Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared 5 Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mt in depth, 1.5 mt in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil 6 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size)Crushed 7 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand :6 graded stone aggregate 40mm nominal size)Crushed 8 Centring and shuttering including struttingpropping etc and removal of form work for.-Foundations, footings, bases of columns for mass concrete 9 Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 Coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with cement mortar 1:6 (1 Cement : 6 coarse sand) 10 Cement concrete flooring 1:2:4 (1 Cement : 2 Coarse Sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm mthich with 20 mm nominal size aggregate 11 Providing and Layingdamp proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete 12 Carriage of different Materials from source to site of work: Sand average10 KMs Mechanical Transport and 500 Mt Head Load 13 Carriage of different Materials from source to site of work: Bajri average10 KMs Mechanical Transport and 500 Mt Head Load 14 Carriage of different Materials from source to site of work: Stone average500 Mt Head Load 15 Water Harvesting Structure 16 Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared 17 Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mt in depth, 1.5 mt in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil 18 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size)Crushed 19 Providing and Laying of Cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centering , shuttering and finishing with 1:3:6 (1 cement: 3 coarse sand :6 graded stone aggregate 20mm nominal size) 20 Centring and shuttering including struttingpropping etc and removal of form work for.-Foundations, footings, bases of columns for mass concrete. Retaining walls, Return walls, Walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc 21 Carriage of different Materials from source to site of work: Sand average10 KMs Mechanical Transport and 500 Mt Head Load 22 Carriage of different Materials from source to site of work: Bajri average10 KMs Mechanical Transport and 500 Mt Head Load