| 1 | Supply of Materials |
| 2 | Top Channel holding clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 3 | Dropper Channel holding clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 4 | T-off Channel holding clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 5 | Stay Clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 6 | F Bracket suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 7 | X-arm Clamp suitable for 8.5 meter PCC Pole with Nut & Bolt |
| 8 | MS Nut Bolt Warious size |
| 9 | Shackle insulator |
| 10 | Suspension Clamp |
| 11 | LT Clamp |
| 12 | PG Clamp |
| 13 | Errection Work |
| 14 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and unloading, errection of 8.5 meter PCC Pole with complete fitting as per respo norms. (This work includes grouting and earthing of pole) |
| 15 | Safe Loading, carriage of 8.5 Meter PCC Pole from Store Center Chilbila Pratapgarh to work site (Distance 10-70 K.M.) and Construction of double pole as per respo norms. |
| 16 | Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 10-70 K.M.) of ACSR weasel conductor and other line Materials. |
| 17 | Stringing and Sagging of three phase 11 KV Line on 8.5 meter PCC Pole with ACSR weasel conductor and binding with insulator. |
| 18 | Carriage of 11 KV Xlpe Cable Size 3X120sqmm, and laying/Stringing of cable for HT line with complete fitting and the same with filling/jointing of Cable Box as per RESPO norms. |
| 19 | Safe Loading, Carriage from Store Center Chilbila Pratpagarh to work site (Distance 10-70 K.M.), unloading, Stringing/layingof LT ABC Cable (3x95+1x95+1x16), Sq.mm. for LT Line with complete fitting of Eye hook, Suspension clamp, Dead end clamp distribution box and other materials also including the work of disconnection and re-connection ofexisting consumers on that line. All the will be executed as per RESPO norms. |
| 20 | Dismentalling of existing 10 KVA transformer and Installation on new erected 8.5 m PCC Pole with all accesories with energization as per RESPO norms. |
| 21 | Dismentalling of existing 25 KVA transformer and Installation on new constructed double pole on 8.5 m PCC Pole with all accesories with energization as per RESPO norms. |
| 22 | Dismentalling of existing 250 KVA transformer and Installation on new constructed double pole on 8.5 m PCC Pole with all accesories with energization as per RESPO norms. |
| 23 | Construction of pilinth for 250 KVA Transformer size 1.5*1.5*1.75 Meter with materials |
| 24 | Safe carriage of received back material with proper stacking of old conductor in bundles and carriageto the store |
| 25 | Complete stay grouting and nozzaling as per respo norms. |