Tender For Work For 11 Kv Feeder Bi Fircation Under Electricity Distribution Division-Nautanwa. - Work Feeder Bi Fircation Under Edd Nautanwa Under Business Plan 2025-26 2 Part-Aloading,Safe Carriageand Unloading Of Following Materialfrom Electricity St
Tender Overview
Project Description
Tender For Work For 11 Kv Feeder Bi Fircation Under Electricity Distribution Division-Nautanwa. - Work Feeder Bi fircation Under EDD Nautanwa Under Business Plan 2025-26 2 PART-ALoading,safe carriageand unloading of Following Materialfrom Electricity Store Center Maharajganj to work site 3 S.T. POLE 11 Mtr. M.-IS 410 SP-50 4 P.C.C. POLE 11 Mtr. 5 P.C.C. POLE 8.5 Mtr. 6 A.C.S.R. WEASEL CONDUCTOR 7 11 KV O/G VCB 8 11 KV 3x185 sqmm XLPE Cable 9 11 KV V TYPE STEEEL CROSS ARM 10 11KV COMPOSIT POLYMER PIN INSULATOR 11 11KV COMPOSIT POLYMER DISC INSULATOR 12 Stay Set Complete 13 Earthing Complete 14 T-Off Channel 15 Top channel 16 Cable Jointing Kit Indoor 17 Cable Jointing Kit Outdoor 18 Cross Bracing 19 Gurading Angle 20 PART-BSupply of following Decentralized Item 21 CROSS ARM HOLDING CLAMP 22 Nut and Bolt 23 F - Braket 24 F - Braket Clamp 25 Stone Pad 26 Alluminium Binding Wire 6swg 27 Barbed Wire 28 I Bolt with Nut 29 G.I wire 30 Tee off Channel Clamp 31 Top,Channel Clamp 32 PART-CWORK AT SITE AS PER SPECIFICATION 33 Concreting of Stay 34 Erection and Grouting of Pole with all assesories 35 Erection and Grouting of earthing Complete 36 Laying 11 KV 3x185 sqmm XLPE cable 37 Installation of 11 KV VCB 38 Plinth and foundation for VCB Panel 39 Chemical Earthing for VCB Panel 40 Installation of ACSR Weasel Conductor 41 Installation of Cable Jointing Kit Indoor 42 Installation ofCable Jointing Kit Outdoor 43 Installation ofT-Off Channel 44 Installation ofTop channel 45 Installation ofCROSS ARM HOLDING CLAMP 46 Installation ofNut and Bolt 47 Installation ofF - Braket 48 Installation ofF - Braket Clamp 49 Installation ofStone Pad 50 Installation ofAlluminium Binding Wire 6swg 51 Installation ofBarbed Wire 52 Installation ofTee off Channel Clamp 53 Installation ofTop,Channel Clamp
BOQ
| Sl. No. | Item Description |
| 1 | Work Feeder Bi fircation Under EDD Nautanwa Under Business Plan 2025-26 |
| 2 | PART-ALoading,safe carriageand unloading of Following Materialfrom Electricity Store Center Maharajganj to work site |
| 3 | S.T. POLE 11 Mtr. M.-IS 410 SP-50 |
| 4 | P.C.C. POLE 11 Mtr. |
| 5 | P.C.C. POLE 8.5 Mtr. |
| 6 | A.C.S.R. WEASEL CONDUCTOR |
| 7 | 11 KV O/G VCB |
| 8 | 11 KV 3x185 sqmm XLPE Cable |
| 9 | 11 KV V TYPE STEEEL CROSS ARM |
| 10 | 11KV COMPOSIT POLYMER PIN INSULATOR |
| 11 | 11KV COMPOSIT POLYMER DISC INSULATOR |
| 12 | Stay Set Complete |
| 13 | Earthing Complete |
| 14 | T-Off Channel |
| 15 | Top channel |
| 16 | Cable Jointing Kit Indoor |
| 17 | Cable Jointing Kit Outdoor |
| 18 | Cross Bracing |
| 19 | Gurading Angle |
| 20 | PART-BSupply of following Decentralized Item |
| 21 | CROSS ARM HOLDING CLAMP |
| 22 | Nut and Bolt |
| 23 | F - Braket |
| 24 | F - Braket Clamp |
| 25 | Stone Pad |
| 26 | Alluminium Binding Wire 6swg |
| 27 | Barbed Wire |
| 28 | I Bolt with Nut |
| 29 | G.I wire |
| 30 | Tee off Channel Clamp |
| 31 | Top,Channel Clamp |
| 32 | PART-CWORK AT SITE AS PER SPECIFICATION |
| 33 | Concreting of Stay |
| 34 | Erection and Grouting of Pole with all assesories |
| 35 | Erection and Grouting of earthing Complete |
| 36 | Laying 11 KV 3x185 sqmm XLPE cable |
| 37 | Installation of 11 KV VCB |
| 38 | Plinth and foundation for VCB Panel |
| 39 | Chemical Earthing for VCB Panel |
| 40 | Installation of ACSR Weasel Conductor |
| 41 | Installation of Cable Jointing Kit Indoor |
| 42 | Installation ofCable Jointing Kit Outdoor |
| 43 | Installation ofT-Off Channel |
| 44 | Installation ofTop channel |
| 45 | Installation ofCROSS ARM HOLDING CLAMP |
| 46 | Installation ofNut and Bolt |
| 47 | Installation ofF - Braket |
| 48 | Installation ofF - Braket Clamp |
| 49 | Installation ofStone Pad |
| 50 | Installation ofAlluminium Binding Wire 6swg |
| 51 | Installation ofBarbed Wire |
| 52 | Installation ofTee off Channel Clamp |
| 53 | Installation ofTop,Channel Clamp |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender