}

Repair Leakage On All Water Supply Pipe Line, Handpaump, Valve With Material And Motor Rewinding,Operating Filter Plant And Pump House On Contract Basis, Supply Of Man Power For Value Operating And Other Work Related To Water Supplyfor The Year 2025-2026M, dhamangaon-Maharashtra

Tender Notice

51787504
Repair Leakage On All Water Supply Pipe Line, Handpaump, Valve With Material And Motor Rewinding,Operating Filter Plant And Pump House On Contract Basis, Supply Of Man Power For Value Operating And Other Work Related To Water Supplyfor The Year 2025-2026M
Tender
Indian
Maharashtra
Dhamangaon
24-10-2025

Tender Details

Repair Leakage on all Water supply Pipe line, Handpaump, Valve with material and Motor Rewinding,Operating filter Plant and Pump House on Contract basis, supply of Man power for Value operating and other work related to water Supplyfor the year 2025-2026Municipal Council Dhamangaon Railway Dist Amravati-1 C.I.Pipe parts 2 Excavation for Leakeges and chokup 3 400 mm Mechnical Joint 4 350 mm Mechnical Joint 5 300 mm Mechnical Joint 6 250 mm Mechnical Joint 7 200 mm Mechnical Joint 8 150 mm Mechnical Joint 9 125 mm Mechnical Joint 10 100 mm Mechnical Joint 11 80 mm Mechnical Joint 12 150 mm C.I.D Joint Class 15 13 125 mm C.I.D Joint Class 15 14 100 mm C.I.D Joint Class 15 15 80 mm C.I.D Joint Class 15 16 400 mm Rubber Ring 17 350 mm Rubber Ring 18 300 mm Rubber Ring 19 250 mm Rubber Ring 20 200 mm Rubber Ring 21 150 mm Rubber Ring 22 125 mm Rubber Ring 23 100 mm Rubber Ring 24 75 mm Rubber Ring 25 150 mm C . I. Valve 26 100 mm C. I. Valve 27 80 mm C. I. Valve 28 Spindle Rod 400 mm 29 Spindle Rod 350 mm 30 Spindle Rod 300 mm 31 Spindle Rod 250 mm 32 Spindle Rod 200 mm 33 Spindle Rod 150 mm 34 Spindle Rod 125 mm 35 Spindle Rod 100 mm 36 Spindle Rod 80 mm 37 Check Nut 400 mm 38 Check Nut 350 mm 39 Check Nut 300 mm 40 Check Nut 250 mm 41 Check Nut 200 mm 42 Check Nut 150 mm 43 Check Nut 125 mm 44 Check Nut 100 mm 45 Check Nut 80 mm 46 Nut Bolt 47 Packing रस्सी 48 P.V.C.Pipe parts 49 160 P.V.C. Pipe/6kg 50 140 P.V.C. Pipe/6kg 51 110 P.V.C. Pipe/6kg 52 90 P.V.C. Pipe/6kg 53 75 P.V.C. Pipe/6kg 54 63 P.V.C. Pipe/6kg 55 160 mm P.V.C. C.I.D. Joint 56 140 mm P.V.C. C.I.D. Joint 57 110 mm P.V.C. C.I.D. Joint 58 90 mm P.V.C. C.I.D. Joint 59 75 mm P.V.C. C.I.D. Joint 60 63 mm P.V.C. C.I.D. Joint 61 90 mm P.V.C. Enel cup. End Cap 62 75 mm P.V.C. Enel cup. End Cap 63 63 mm P.V.C. Enel cup. End Cap 64 160 mm P.V.C. Enel cup. End Cap 65 140 mm P.V.C. Enel cup. End Cap 66 110 mm P.V.C. Enel cup. End Cap 67 140 x 90 P.V.C. Bend 68 90 x 90 P.V.C. Bend 69 90 x 75 P.V.C. Bend 70 90 x 63 P.V.C. Bend 71 110 mm P.V.C. Tee 72 90 mm P.V.C. Tee 73 75 mm P.V.C. Tee 74 63 mm P.V.C. Tee 75 140 mm P.V.C. Tee 76 90 mm P.V.C. MTA 77 75 mm P.V.C. MTA 78 63 mm P.V.C. MTA 79 140 mm P.V.C. Elbow 80 110 mm P.V.C. Elbow 81 90 mm P.V.C. Elbow 82 75 mm P.V.C. Elbow 83 63 mm P.V.C. Elbow 84 63 mm P.V.C. Coupler 85 75 mm P.V.C. Coupler 86 90 mm P.V.C. Coupler 87 110 mm P.V.C. Coupler 88 160 mm P.V.C. Coupler 89 75 mm P.V.C. Bend 90 90 mm P.V.C. Bend 91 110 mm P.V.C. Bend 92 160 mm P.V.C. Bend 93 90 x 75 P.V.C. Reducer 94 63 x 75 P.V.C. Reducer 95 90 x 110 P.V.C. Reducer 96 110 x 114 P.V.C. Reducer 97 140 x 160 P.V.C. Reducer 98 140 x 63 P.V.C. Reducer 99 140 x 75 P.V.C. Reducer 100 110 x 63 P.V.C. Reducer 101 90 x 63 P.V.C. Reducer 102 90 x 140 P.V.C. Reducer 103 90 x 75 P.V.C. Reducer 104 U. P. V. C. PIPE PARATS 105 32 mm U, P.V.C. Pipe 106 25 mm U, P.V.C. Pipe 107 20 mm U, P.V.C. Pipe 108 15 mm U, P.V.C. Pipe 109 15 mm U.P.V.C. L Bow 110 20 mm U.P.V.C. L Bow 111 25 mm U.P.V.C. L Bow 112 15 mm U.P.V.C. Coupler 113 20 mm U.P.V.C. Coupler 114 25 mm U.P.V.C. Coupler 115 15 mm U.P.V.C. Tee 116 20 mm U.P.V.C. Tee 117 25 mm U.P.V.C. Tee 118 15 mm U.P.V.C. Bend 119 20 mm U.P.V.C. Bend 120 25 mm U.P.V.C. Bend 121 25 m , U, P.V.C. Capling Brass 122 15 m , U, P.V.C. Capling Brass 123 32 mm P.V.C. Broch Elbo 124 25 mm P.V.C. Broch Elbo 125 15 mm P.V.C. Broch Elbo 126 1 U, P.V.C. Broch Tee 127 3/4 U, P.V.C. Broch Tee 128 1/3 U, P.V.C. Broch Tee 129 1 U, P.V.C. Plean Tee 130 25 m U,P.V.C. Brash Innor 131 20 m U,P.V.C. Brash Innor 132 15 m U,P.V.C. Brash Innor 133 25 m U,P.V.C. Plean Uniyan 134 20 m U,P.V.C. Plean Uniyan 135 15 m U,P.V.C. Plean Uniyan 136 U, P.V.C.Soletion 100 ml tube 137 25 m U, P.V.C. Outter Brash 138 20 m U, P.V.C. Outter Brash 139 15 m U, P.V.C. Outter Brash 140 15 m Garden Role Pipe 141 90 mm P.V.C. Valve 142 110 mm P.V.C. Valve 143 75 mm P.V.C. Valve 144 63 mm P.V.C. Valve 146 Fanwash Sheet 147 rubber seat 148 Soletion P.V.C. 149 Repairing Air Valve (with instructions) 150mm Leakage Repair 400mm CI Pipe 151 Labor Leakage Repair 350 - 300 mm CI Pipe 152 Labor Leakage Repair 250 -200mm CI Pipe 153 Labor Leakage Repair 150 -80 mm CI Pipe 154 Labor Valve Repair 400 mm 155 Valve clearance 350 - 300 mm 156 Labor Valve Repair 250 -200mm 157 Valve Length 150 -80 mm 158 Labor Leakage Repair 160mm - 110 mm PVC Pipe 159 labor leakage repair 90 mm - 63 mm PVC Pipe 160mm Leakage Repair 32mm - 15mm PVC Pipe 161 Hand Pump 162 Hand Pump Repair Labor 163 4mm (4 cotton) Handpump Rod 164 Ball Bearing 165 Hand Pump Chembar (Head) 166 Hand Pump Water Chembar 167 Hand Pump Handle (Blackjack) 168 Hand Pump Chain 169 Hand Pump Chavi 170 Hand Pump Ring Waiser 171 Hand Pump Tikli Waiser 172 Hand Pump Cylinder 173 Hand Pump Upper Valve 174 Hand Pump Lower Valve 175 Hand Pump Stand 176 32 mm G.I. Pipe B - Class P.S. 177 32 mm G.I. Coupling 178 Vavles Takiyavar Lokhandi Jali prepared and brought. 179 Motor Rewinding, Repairing and ATS Starter Work 180 170 HP (VT)Motor Reviding 181 50 HP Centrifugal (Induction Motor)Rewinding 182 10 HP Centrifugal (Monoblock Motor) Reviding 183 7.5 HP Centrifugal (Monoblock Motor) Reviding 184 3 HP Centrifugal (Monoblock Motor)Rewinding 185 40 HP Submersible MotorRewiring 186 30 HP Submersible MotorRewiring 187 30 HP Submersible Pump Repair 188 5 HP SubmersibleMotorRewiring 189 1 HP Submersible MotorRewiring 190 ROTOR BEARING AND BUSHING 1Hp to 5 HP 191 Making rotor bearing and bushing 5Hp to10HP 192 Making rotor bearing and bushing 30 Hp to 50HP 193 ROTOR BEARING AND BUSHING 170HP 194 Making Shaft for 50 Hp Centrifugal Pump with Fitting 195 Pump Bearing ,Bushing and Fitting1Hp to 5 HP 196 Pump Bearing ,Bushing and Fitting 1Hp to 5 HP 197 Pump Bering ,Bushing and Fitting30 Hp to 50HP 198 Pump Bearing,Bushing and Fitting 170HP 199 Bearing 170 HP VT Motor(Big) 200 Bearing 170 HP VT Motor(Small) 201 Bearing 50 HP Centrifugal Motor 202 Bearing 5 HP to 10 HP Centrifugal Motor 203 Thrust Bearing 30HP to 40 HP 204 Thrust Bearing 1HP to 5 HP 205 Repairing 170 HP Vertical Turbine Motor (Vertical Turbine Pump) of VT Pump Springer Bushing, VT Pump TT Plate Bushing, VT Pump Ball Assembly, VT Pump Impeller neck ring, VT pump bowl sleeve, VT pump stener shaft sleeve, etc. including workshop work, Dismanntling , Assebling, No load and on load testing and transpotation charges 206 Repairing of Shaft of 40 HP Submersible Pump, ImpellerStageneck ring Bronze welding and cutting , Upper and LowerBushing of Pump, including Dismantling, Assembling, Testingand transportation Charges 207 Repairing of 50 HP Centrifugal Coupled pump set Dismantling making and providing shaft, baring sheet on shaft with bearing, cover bearing sheet, Covering of material on the coupling cover Slave Turningpolishing and making QA Slot to the coupling providing and fitting of rubber busses and Nut bolt etc. for the coupled pump set. Assembling and Re-erection of 50 HP Centrifugal Coupled Pump set including making accurate leveling and proper alignment, testing of Pump on no load and on load at site including transportation charges. 208 Supply, Erecting, commissioningand testing of Spare Coil for Contactor L & T ATS Starter for 170 HP VT Pump (MNX 550CS94193) 209 Supply, Erecting, commissioningand testing ofKit for Contactor L & T ATS Starter for 170 HP VT Pump (MNX 550) 210 Supply, Erecting, commissioningand testing of Spare Coil for Contactor L & T ATS Starter for 50HPPump (MNX 225 ) 211 Supply, Erecting, commissioningand testing of Spare Coil for Contactor L & T ATS Starter for 50 HPPump (MNX 225 ) 212 Three Phase 200 Amp Main Switch 213 Three Phase 100 Amp Main Switch 214 Three Phase 63 Amp Main Switch 215 Three Phase Motor Automatic Switch 216 Supply and Installing Capacitor 217 job description 218 In the year 2025-26, the pump house of the water supply department at Juna Dhamangaon Water Purification Center will be operated 24 hours, Jack well of the water supply department will be operated 24 hours, operator, watchman and maintenance in the water supply department, water purification related work and electric motor, pump, starter (panel) etc. To submit the rate collected in respect of maintenance cost of the Kirkol on monthly contract basis along with maintenance expenses.

Key Value

Document Fees
INR 500 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail