Repair work under State Disaster Relief Fund Scheme %& jkmizkfo yksVokMk] Mahatma Gandhi Government School, Gupteshwar Road, Dausa] Kasturba Gandhi Girls Residential School, Dausa] Government Primary School, Meena Colony, BLOCK-DAUSA - Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.1: 3: 6 or richer mix. 2 Grading roof for water proofing treatment withwater proffing compoundCement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 3 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. Thermo-mechanically Treated bars (Conforming of relevent IS code) 4 Repairs to plaster of thickness 12mm to 20mm in patches ofarea 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plasteringthe surface of the walls complete including disposal of rubbishto the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand) 5 Gola Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2coarse sand : 4 stone aggregate 10mm and down gauge) includingfinishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : 6 Painting exterior surface ofWallwith 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty,etc complete in all respect including scaffolding and safety provision New Work 7 Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc.Good soil of earthFilling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. 8 Internal Finishing: Distempering with oil bound washeble distemper of approved brand and manufacture to give an even shade including all scaffolding new work (two or more coats) over and including scrapping and priming coat with cement primer 9 Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel propsand removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates,anchorblocks,sills,chhajjas,lintel,beam, plinth beam etc. 10 P&F rigid PVC Pipe (IS:4985 mark) class II(4 Kg. /Cm.) approved quality /makeincluding joining the pipe with solvent cement rubber ring and lubricant 110mm dia 11 PANTING ON DOORS & WINDOWS :- Painting with synthetic enamel paint of approved brand and manufacture togive an even shade : Two or more coats on new work 12 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter.All kinds of soils 13 PCC in Foundation : Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). 14 PCC in Foundation : Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stoneaggregate 40mm nominal size). 15 Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). 16 Stone Kharanja : Random rubble dry stone Kharanja under floor. 17 Brick work with clay flyash F.P.S. brick of class designation 75 in superstructureaboveplinth level upto floor five level in :Cement mortar 1 : 6 (1 cement : 6 coarse sand) 18 ExternalPlaster : Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :20mm thick. 19 Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide Extra if square,rectangular hollow tubelarsections are used or grill made by flats only 20 Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/ vertical or curved surfaces)excluding the cost of purlins, rafters and trusses and including cutting to size and shape whenever required.1.00 mm thick with zinc coating not less than 275 gm/m2 21 Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3mm thick water proofing membrane, black finished reinforced with non-woven polyester mattconsisting of a coat of bitumen primer for bitumen membran @ 0.40 Itr/sq.mt. by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ltr and viscosity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under Joint strength in longitudinal and transverse direction at 23°C as 650/450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D-5147. The laying of membrane shall be got done through the authorized applicator of the manufacturer of membrane.3 mm thick