|
| 1 | Earth work excavation in all kinds of soil from the existing ground level in foundation trenches & levelling, ramming as per requirement etc with all leads and lift disposing the excavated material within a lead of 5 km at locations as directed, dewatering etc with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc all complete as per direction of Engineer in charge.(Excluding GST) |
| 2 | Providing & layingquarry dust of aprroved as sub-base in layerswatering and compacting to the required densitywith Vibratory Roller with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC . |
| 3 | Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(63 mm to 45 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with PRR 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices of coarse aggregate with Quarry dust , watering and compacting with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC |
| 4 | Providing , laying, spreading and compacting stone aggregates of IRC Gr-III (53mm to 22.4mm)size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with PRR 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fillup the interstices of coarse aggregate with Quarry dust ,watering and compacting with supply of all material labour transporation hire and running charge of equipments, taxes , tollage, royalties etc all complete but excluding GST as directed by EIC |
| 5 | Providing and laying50 mm thick bituminous macadamusing crushed aggregates 25-10 mm @40%,10-5 mm @40%, 5mm @20% of total volume of chips adding premixed with bituminous binder of VG-30 bitumen of 3.3% of total volume, transported to site, laid over a previously prepared surfaceto the required grade, level and alignment and rolled by VRRto achieve the desired compaction with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC (For New work) |
| 6 | Providing & laying 20mm thick premix carpet using 0.27cum of 13.2mm to 5.6mm size crushed stone chipping and 14.60kg. penetration grade of bitumen for 10sqm including hand packing to proper camber and consolidation with VRR including hire and running charges of PRR, hot mix plant, bitumen boilers and all other T & P articles as per specification including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as ditrected by EIC.(by using mini batching plant and bitumen boiler at site) |
| 7 | Providing & laying 6mm thick precoated seal coat using 0.06 cum of 6.7mm size chips as per sieveanalysis and 6.8Kg of bitumen per 10sqm. maintain proper camber and consolidation with VRR including hire and running charges of PRR, hot mix plant, bitumen boilers and all other T & P articles with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC(by using mini batching plant and bitumen boiler at site) |
| 8 | Blinding road surface with 6mm thick Quarry Dust over the final surface of bitumen with supply of all material labour transporation hire and running charge of equipments,etc all complete but excluding GST as directed by EIC. |