| 1 | LAKHAN CHOWK BANSIPURANDAHA PATH SE MANDAL TOLA |
| 2 | Setting OutConstruction of Reference & Working Benchmarks |
| 3 | Construction of Reference Pillars/Burjees |
| 4 | Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. |
| 5 | Construction of Embankment with Material Obtained from Borrow Pits (1000m Lead)Construction of embankmentwith approved materialobtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause 301.5. |
| 6 | Construction of Embankment with Material Obtained from Borrow Pits (100m Lead)Construction of embankmentwith approved materialobtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 100m as per Technical Specification Clause 301.5. |
| 7 | Construction ofSubgradeConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 8 | Granular Sub-base with Well Graded Material (Table 400.1)Construction of granular sub-baseby providingwell gradedmaterial (Crushed Stone Aggregates and stone dust) spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with threewheel 80-100 kN static roller capacity to achieve thedesired density, complete as per Technical Specification Clause 401 |
| 9 | WBM GrIIProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.(A) By Manual Means |
| 10 | Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
| 11 | Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 12 | Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.2-0.25kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 13 | Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 14 | Mix Seal Surfacing Bituminous With Waste PlasticProviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen (i.e. 92% of standard Bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509.By Mechanical Means |
| 15 | Semi-Dense Bituminous ConcreteProviding and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 16 | Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 |
| 17 | Ordinary Kilometer Stone (Precast) |
| 18 | 200 m stone (precast) |
| 19 | Painting two coats on new concrete surfacePainting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 (For culverts) |
| 20 | Printing new letters & figures of any shadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Clause 1701(ii) English & Roman |
| 21 | PMGSY Sign BoardProviding and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 |
| 22 | Retro-reflectorised Traffic SignsProviding and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as perdrawings and Technical Specification Clause 801 |
| 23 | 600 mm equilateral triangle |
| 24 | 600 mm x 450 mm rectangular |
| 25 | 900 mm side octagon |
| 26 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 27 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 28 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203PCC M-15 |
| 29 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203PCC M-20 |
| 30 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204( PCC Grade M-20) |
| 31 | Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry |
| 32 | 1000MM Dia Pipe |
| 33 | 600MM Dia Pipe |
| 34 | Laying Cement Concrete Pipe NP3(burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets |
| 35 | Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) Type B (First Class) Bedding |
| 36 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9(i)Sand Filling |
| 37 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragmentweighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 |
| 38 | Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year |
| 39 | Add 1.0% Labour Cess |
| 40 | Add Seigniorage |
| 41 | Add 18.0% GST |
| 42 | 1st Year Maintenance |
| 43 | 2nd Year Maintenance |
| 44 | 3rd Year Maintenance |
| 45 | 4th Year Maintenance |
| 46 | 5th Year Maintenance |
| 47 | 6th Year Maintenance |
| 48 | Add 1.0% Labour Cess |
| 49 | Add Seigniorage on Maintenance |
| 50 | Add 18.0% GST |