| 1 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 2 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 3 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 4 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 5 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 6 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 7 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 8 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 10 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 11 | Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
| 12 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
| 13 | Fitting 3 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
| 14 | Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials. |
| 15 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. |
| 16 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 17 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 18 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 19 | Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 20 | Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store. |
| 21 | Dismantling one Channel cross arm from existing DP structure, and bringing back to section store. |
| 22 | Dismantling 100kVA Transformer, erecting new 100kVA Transformer, giving connections incl. loading & unloading at site. |
| 23 | Dismantling 160kVA Transformer, erecting new 160kVA Transformer, giving connections incl. loading & unloading at site. |
| 24 | Dismantling 250kVA Transformer, erecting new 250kVA Transformer, giving connections incl. loading & unloading at site. |
| 25 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 26 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 27 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 28 | Dismantling one section fuse |
| 29 | Dismantling one section fuse from distribution box |
| 30 | Stringing of 11 kV Aerial bunched cable of size 3 x 120+ 1 x 95 sqmm with bare/insulated Messenger through existing poles |
| 31 | Erection of suspension clamp for 11KV ABC of any size |
| 32 | Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 120+ 1 x 95 sqmm with bare insulated Messenger |
| 33 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 34 | Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections. |
| 35 | Dismantling one suspension clamp from 11 KV ABC |
| 36 | Dismantling one Anchor clamp /dead end clamp from 11 KV ABC |
| 37 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 38 | Redoing /Renewal of a damaged /old/jointed Sph WP service wire complete including lowering down the guy wire and WP portion,Changing WP,guy wire,binding ,properly routing the WP wire etc and reconnecting the same including conveyance of materials to site from section store and back at various section |
| 39 | Redoing /Renewal of a damaged /old/jointed 3 ph WP service wire complete including lowering down the guy wire and WP portion,Changing WP,guy wire,binding ,properly routing the WP wire etc and reconnecting the same including conveyance of materials to site from section store and back at various section |
| 40 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 41 | Providing/Inserting 2 line spacer on the existing LT OH line. |
| 42 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. |
| 43 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. |
| 44 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of trunks/branches, removing the root completely and stacking. |
| 45 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 46 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 47 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 48 | Constructing Transformer plinth inclusive of cost of all materials (as per specification). |
| 49 | Providing WP support with PSC pole incl. digging & back filling pit. |
| 50 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 51 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 52 | Insertion of one LT PSC pole in existing Sph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. |
| 53 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 54 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 55 | Insertion of one LT PSC pole in existing 3ph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. |
| 56 | Providing/Inserting 3 line spacer on the existing LT OH line. |
| 57 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 58 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 59 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 60 | Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance. |
| 61 | Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance. |
| 62 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 63 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 64 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 65 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 66 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 67 | Fitting one set AB switch and giving connection |
| 68 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 69 | Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 70 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 71 | Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials. |
| 72 | Providing Stay for LT poles incl. digging & back filling pit. |
| 73 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 74 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same. |
| 75 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 76 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 77 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. |