}

Tender For Quantum Of Work For Construction Of New 11 Kv Line And S/S Lt For Releasing Connection Under Full Deposite Scheme In The Area Of Edsd-Iii, Miyaganj Under Divison-Hasanganj , Unnao. - Safe Carriage Of Following Materials From Esc Store Centre Un, unnao-Uttar Pradesh

Tender Notice

51752843
Tender For Quantum Of Work For Construction Of New 11 Kv Line And S/S Lt For Releasing Connection Under Full Deposite Scheme In The Area Of Edsd-Iii, Miyaganj Under Divison-Hasanganj , Unnao. - Safe Carriage Of Following Materials From Esc Store Centre Un
Tender
Indian
Uttar Pradesh
Unnao
24-10-2025

Tender Details

Quantum Of Work For Construction Of New 11 Kv Line And S/S Lt For Releasing Connection Under Full Deposite Scheme In The Area Of Edsd-Iii, Miyaganj Under Divison-Hasanganj , Unnao. - Safe Carriage of following Materials from ESC Store Centre Unnao to work dump site/dump site to ESC Store along with loading unloading & proper stocking as per requirement. 2 PCC/STP Pole 3 HT XLPE Cable 3x70 sq mm / 3X120 sq mm 11 KV 4 ACSR Weasel Conductor/Rabit Conductor 5 Arial bunch Conductor 1X16 / 3X50 / 3X95 sq mm 6 Distribution Transformer 25 KVA/ 63KVA/ 100 KVA11/0.4 KV 7 11 KVPilfer proof metering cubical andCT/PT unit 8 Loose line material. 9 Erection of PCC/ STP Double Pole Structure including digging of pit and fitting of all accessories complete. 10 Erection of PCC/ STP Pole including digging of pits, fitting of all accessories with its cartage dump site as per RESPO norms. 11 Making of H.T./L.T. Section points by brackets, clamps & Making of T-off arrangement for including fabrication and fitting of all accessories. 12 Grouting OF PCC Pole as per RESSPO norms with grouting materials. 13 Earthing of PCC/ STP Pole as per RESSPO norms. 14 Digging of pits, fixing, nuzzling and grouting of stay rods as per RESSPO norms with grouting materials. 15 Fabrication/ Modifications of MS Items, for making sub station/HT/LT Line for 25/63/100 KVA Distribution Transformer, Nuts & Bolts as per requirement of site conditions. 16 Dismantling for Line Shifting of single pole/ Double Pole, Conductor, AB Cable and X-arms, brackets, Insulators, Channels and all hardware fittings. 17 Dismantling for Shifting Distribution Transformer on pole / plinth, Earthing and all related fittings. 18 Placement of 11/0.433 KV Distribution Transformer newly constructed T/F on Duble Pole Installation andcommissioning of 25/63/100 KVA Transformerincluding lugs,Jumpering & connectingEarthing ofbody & neutral with proper fitting with lugs,nut& bolt as per required. 19 Supply and Fixing of following materials 20 Holding clamps for PCC/STP with Nuts & Bolts. 21 Stay clampsfor PCC/STP with Nuts & Bolts. 22 LT clamps with Insulator for PCC/STP with Nuts & Bolts. 23 F-clamps for PCC/STP with Nuts & Bolts. 24 LT Shackle Insulator with nuts & bolts 25 Laying of 11 KV cable size 3x70 sq mm/120 sq mm, dragging of trench 1050 mm, deep 520 mm wide, including all materials etc. /overhead on pole as required on site. 26 Making of cable box for 11 KV 3x70 to 3x120 sq.mm cable jointing kit/cable box. 27 Laying Stringing & sagging of HT line by ACSR Weasel Conductor including all related work as joints /jumpers and binding on Insulators as required. 28 Laying, stringing Aerial Bunched Cable 1x16 / 3x50/ 3x95 sq mm including all related work as joints /jumpers and binding on Insulators as required. 29 Installation and testing and commissining New 11 KV Pilfer proof metering cubical in Metering Room andCT/PT unit on pole and Cable terimanison, connecting earthing etc. 30 Installation and commissining of H.T. D.O. Fuse Set with Dropper Channel on new double pole as per RESPO norms 31 Cable hosting at pole with GI pipe & clamps as per RESPO Norms ( GI Pipe Provided by Contractor) 32 Laying, stringing, tensioning & final sagging Guarding of Earth wire/G.I. wire including of cross lacing (minimum 10 no. in each span) 33 Chopping of tree branches lying in the route of making new 11 KV / LT line. 34 Received Back of Dismentling Material from work dump site/dump site to ESC store along wit loading unloading & proper stocking as per requirement 35 Distribution Transformer 25 KVA/ 63KVA/ 100 KVA11/0.4 KV 36 Scrap Iron 37 Scrap /Old & Used Cable and Conductor

Key Value

Document Fees
INR 1180 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail