|
| 1 | Taking up or down steel tubing 15 mm |
| 2 | Taking up or down steel tubing 25-32 mm |
| 3 | S/F PVC PIPE 15 mm |
| 4 | S/F PVC PIPE 25 mm |
| 5 | Taking down plaster |
| 6 | Taking down Tiles |
| 7 | Applying Brushing Neat Cement slurry |
| 8 | Applying Rendering 10mm thick (1:4) on fair faces of brick work or concrete surfaces |
| 9 | S&F Glazed ceramic Tiles as per requirement |
| 10 | Demolition CC on flooring |
| 11 | S&F of Loose filling |
| 12 | Providing, cement concrete Type B0 (1: 2: 4) |
| 13 | S&F Non Skid Ceremic Tiles |
| 14 | S&F of Screed Bed (1:4) or bedding layer of mortar 15 mm thick for laying floor finishes |
| 15 | S&F of Grating doom 100 mm ptmt |
| 16 | Providing of Cutting chases |
| 17 | Supply Vitreous Chine squatting pan |
| 18 | Add in repair |
| 19 | S&F of PVC Sewer S trap |
| 20 | Supply of Flushing cistern |
| 21 | Fixing only Flushing cistern |
| 22 | Supply wash basin,600x480mm |
| 23 | Fixing Basin |
| 24 | S&F Waste coupling of PTMT |
| 25 | S/F Pillar taps of PTMT |
| 26 | S&F Angle stop valve PTMT |
| 27 | S&F Towel Rail |
| 28 | S&F Vitreous China Soap tray |
| 29 | S&F Shower PTMT |
| 30 | S/F Bib tap standard long body |
| 31 | S&F PVC Conection 600 mm |
| 32 | S&F Taking down shaters with frame |
| 33 | S/F PVC Door Shutter |
| 34 | S/F Solid PVC Door Frame |
| 35 | S&F Stack Clamp |
| 36 | S&F Door Handles |
| 37 | S&F But hinges |
| 38 | S&F Tower Bolt |
| 39 | S&F Sliding Door bolt |
| 40 | S&F PVC (SWR) pipes 110 mm |
| 41 | S&F PVC (SWR) pipes 75 mm |
| 42 | Remooving material |
| 43 | S&F Brick Work with Cement mortar (1:4) |
| 44 | S&F PVC Junction |
| 45 | S&F Gate Valve |
| 46 | S&F Bal Valve 15 mm |
| 47 | S&F Bal Valve 20 mm |
| 48 | S&F Bends any type |
| 49 | Painting Preparation on plaster/brick |
| 50 | Applyinig/providing of OBD two coat |
| 51 | Applyinig/providing of 3mm thick wall care putti. |
| 52 | Applying preparation on wood surface (old) |
| 53 | S/F SS Sink |
| 54 | S&F of Nahani Trap 75 mm |
| 55 | S&F of PVC (SWR) gully trap 125/110 mm |
| 56 | Providing/applying of Liquid water proofing compound |
| 57 | Providing of Cutting holes in brick walls |
| 58 | Providing of Excavating in trenches (foul mud) |
| 59 | Providing of Surface dressing |
| 60 | Providing of DEMOLITION CC any type |
| 61 | Add for Reinforcement |
| 62 | Removing building materials from any hight up to 15 M for 1 KM |
| 63 | S/F of powder coating Aluminum doors/2-Track or 3-Track Aluminium sliding Window,Frame section weighing 0.85 to 1.1 Kg/m and shutters aluminum section weighing o.55Kg/mnot more than 4 sqm , including half part with glazing , 4.8 mm thick first quality glasss necessary and half with Pre laminated board 12mm, interior grade both sides laminated joining cleats glazing clips riber neoprene packing handles 2 nos in each door/window hings, latches,tower bolts, door aldrops, door stopers, powder coating snap beading screws etc. complete all as specified. |
| 64 | Taking down point wiring |
| 65 | S&F of One light point |
| 66 | S&F of One 3 pin socket, 15 Amp |
| 67 | S&F of One 3 pin socket, 5 Amp |
| 68 | S&F of PVC rectangular block for mounting, |
| 69 | S&F of Swich 16 Amp |
| 70 | S&F of Socket 16 Amp |
| 71 | S&F of Swich 5 amp |
| 72 | S&F of Socket 5 Amp |
| 73 | S&F of Holder |
| 74 | S&F of Ceilingrose |
| 75 | Credit of PVC door |
| 76 | Credit of Iron Window |
| 77 | Credit of GI pipe |