| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. |
| 2 | Supply and laying of Local Sand For easily early compaction including cost of all material labour T&P etc.as per directed by engineer in charge completefor proper completion of work. |
| 3 | Cement Concrete in (1:2:4) M10 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work |
| 4 | Reinforced Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc.as per directed by engineer in charge completefor proper completion of work |
| 5 | Providing & fixing of NP-3 hume pipe of1200 mm dia including cost of all material, labour,carriage, loading, unloadingetc. complete as directed by engineer in charge |
| 6 | Centering & shuttering fo R.C.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. |
| 7 | Centering & shuttering fo C.C. work in defferent parts of structures all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P. etc. |
| 8 | Provide & Fixing PVC water stop for expantion/ construction jointincluding all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge |
| 9 | Providing & Fixing pvc pipe 75 mm dia for weep hole above FSL and zigzag @ 1.00 mtr distance centre to centre along both sides of the Abutment in position including cost of all mterial, labour and T&P for proper complition of work. |
| 10 | Providing & Fixingsteel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge |
| 11 | Providing and fixing of nomitax Board for expansion / construction joint i/c all cost of material labour T & P etc. for proper comp. of work. |
| 12 | Supply and laying of Shingle size 4.20 to 10 mm in inverted filterincluding cost of all material labour T&P etc.as per directed by engineer in charge completefor proper completion of work. |
| 13 | Cutting, Bending, Binding & Placing in position ofsteel reinforcement (above 10mm dia) with all wastage, carriage and including all labour material and T&P etc complete for proper completion materials, labour and T&P etc. |
| 14 | Provide & Laying Boulder 20.00 to 40.00 kg.wt in launching apron with all lead and liftincluding cost all labour, T&P material etc complete for proper completion of work as per direction of Engineer - in charge |
| 15 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also includingall lift and Lead upto 600 m distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. |
| 16 | Supplying & Fixing B.M. plate 150 X 150 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. |
| 17 | Supplying & Fixing Marble Name & year plate 450 X 300 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work. |